Similar Projects
Elkcam Boulevard Retail
New Construction, Infrastructure - 10,000 SF
Conception
$3,000,000 est. value
Deltona, FL 32738

Seventh Street and South Street Sidewalk Improvements
Infrastructure
Bidding
$800,000 CJ est. value
New Smyrna Beach, FL 32168

Stone Street ADA Improvements
Infrastructure
Bidding
$140,000 CJ est. value
Deland, FL 32720

Parking Improvements at 160 North Causeway (AOB Site)
Infrastructure
Post-Bid
$300,000 est. value
New Smyrna Beach, FL 32169

ADA Parking and Ramp for A.C. Delbert Dewees Municipal Pier
Infrastructure
Post-Bid
Oak Hill, FL 32759

Driveway Replacement
Results
Ormond Beach, FL 32174

Beville Road Multi Use Path - Lap
Infrastructure
Results
Daytona Beach, FL 32116

Dunlawton Storage / StorIT
New Construction, Infrastructure - 103,688 SF
Pending Verification
$13,500,000 CJ est. value
Port Orange, FL 32127

EVAC Operations Overflow Parking Paving Project
Infrastructure
Post-Bid
$150,000 est. value
Holly Hill, FL 32117

As Needed New Sidewalk Installation and Repairs
Term Contract
Results
Deltona, FL

Hospice Orange City Site Devlopment and Parking Lot
Infrastructure
Post-Bid
$400,000 est. value
Daytona Beach, FL 32114

Duss Street Streetscape Project
Infrastructure
Results
$100,000 est. value
New Smyrna Beach, FL 32168

Cherrywood Drive and Division Avenue Sidewalk Repair
Infrastructure
Results
Ormond Beach, FL 32174

Daytona Beach Courthouse Annex Ramp Renovation
Infrastructure
Results
$175,000 est. value
Daytona Beach, FL 32114

Snook Park - Parking and Boardwalk Improvements
Infrastructure
Results
$206,060 est. value
Deltona, FL 32738

Last Updated 07/28/2022 12:51 AM
Project Title

Granada Boulevard Streetscape Sidewalk Banding Repair

Physical Address View project details and contacts
City, State (County) Ormond Beach, FL 32176   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $2,573,294 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of removing all the existing concrete paver banding within the streetscape and replacing the banding with integral colored concrete with coquina shell finish. Other work includes but is not limited to removal of the existing on-grade planters, tree grate and planter box concrete patches, broken curb repair, irrigation removal/capping and cracked/deteriorated concrete panel repair.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents