Similar Projects
Terminal Unit Replacement
Alteration
Post-Bid
$725,000 est. value
Las Vegas, NV 89147

HVAC Service and Repair
Alteration
Post-Bid
Las Vegas, NV 89146

J045--Chiller Comprehensive Service and Maintenance
Results

Satellite Energy Plant (SEP) Cooling Tower Repair
Results
$350,000 est. value
Las Vegas, NV 89154

HVAC Filter Service
Alteration
Post-Bid
Las Vegas, NV

HVAC Air Filter Replacement Service
Alteration
Results
$1,100,000 est. value
NV

High Desert State Prison (HDSP) Air Handler Media Replacement
Alteration
Post-Bid
$3,000,000 est. value
Indian Springs, NV 89070

CSN West Charleston Building G Fume Hood Installation
Alteration
Results
$100,000 est. value
Las Vegas, NV 89146

Autoclave Sterilizer and Boiler Project
Renovation
Post-Bid
$1,500,000 CJ est. value
Las Vegas, NV 89102

SWRF Activated Carbon Media Replacement
Term Contract
Results
Henderson, NV 89074

North Las Vegas Air Handler 12 Replacement
Alteration
Post-Bid
$385,000 est. value
North Las Vegas, NV 89030

Las Vegas Metropolitan Police ARC HVAC Maintenance and Service
Term Contract, Alteration
Results
Las Vegas, NV

WHI Boiler Installation
Renovation
Post-Bid
$160,000 CJ est. value
Las Vegas, NV 89154

HVAC Modifications for All Three Main Campuses
Alteration
Results
$4,300,000 est. value
Henderson, Las Vegas, North Las Vegas, NV 89030

Henderson Multigen Chiller Replacement
Renovation
Post-Bid
$300,000 CJ est. value
Henderson, NV 89012

Last Updated 03/06/2023 11:33 PM
Project Title

Rancho High School JROTC - HVAC Upgrade

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89101   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,431,000 [brand] Estimate
Plans Available from Copy Center - 01/30/23
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of removing existing water-cooled chiller, cooling tower, boiler, pumps, and all related piping. Remove existing control system and exhaust fans. Provide new air-cooled chiller (owner furnished, contractor installed), new boiler, pumps, and all related piping. Provide new control system and exhaust fans. Provide duct and air handler cleaning. Provide flushing and chemical treatment for hydronic piping. Remove existing gas water heater, storage tank, circulating pumps, and related piping for domestic water system. Provide new electric water heaters. Provide new eyewash station. Late arrivals may not be eligible to bid as a Prime Contractor. Bidders must provide their most current letter of pre-qualification issued by the Clark County School District and all information listed in Part 5 of Document 00 21 13 Instructions to Bidders. , The Clark County School District is an equal opportunity employer and will not knowingly discriminate in any area of employment, and invites all businesses to include women-owned, minority-owned, and disadvantaged business enterprise companies to participate in our bidding process. Prequalified Bidders shall have a Nevada Contractor's License with the Classification of C-21. The construction budget for the project is: $2,629,000.00 The Owner's representative is Stephen Molina, Project Manager, and may be reached at (702) 799-8710 Ext. 5220. The A/E representative is Precision Design Group and may be reached at (702) 307-0912. The property upon which the Work is to be performed is located at 1400 Searles Avenue, Las Vegas, 89101. Location: 1900 Searles Avenue, Las Vegas, NV 89101 0015440

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents