Similar Projects
Fire Pumps and DW Pumps Maintenance and Repair
Term Contract
Bidding
Atlanta, GA 30303

Buddy Spann Park Well No. 5 (105)
Bidding
Hazlehurst, GA

Contract A - Well and Chemical Feed Building
Post-Bid
Fort Valley, GA 31030

One Portable Diesel Pump
Post-Bid
Valdosta, GA 31603

Green Infrastructure Design Challenge - Continental Colony Elementary
Results
Atlanta, GA 30331

Wastewater Flow Measurement Stations
Results
Covington, GA 30016

New 30,000 Gallon Draft Pit
Bidding
Valdosta, GA 31606

Well Maintenance
Term Contract
Post-Bid
Savannah, GA 31401

Pond Springs Road Test Well with Production Option
Results
Chickamauga, GA

Bypass Pump Station And Force Main Alternate Route
Bidding
GA

Wet Well Cleaning and Disposal
Term Contract
Post-Bid
Gainesville, GA 30501

Primary Chill Water Pumps Replacement
Results
Savannah, GA

Harbins Park Well Services
Post-Bid
Dacula, GA 30019

Effluent Pump Station Pump Replacement
Results
Less than $100,000 est. value
Camilla, GA 31730

2020 Water System Improvements - Andrews Well 2
Post-Bid
Carnesville, GA 30521

Last Updated 11/27/2020 12:13 PM
Project Title

Hinesville Main Pumping Station Bar Screen Replacement

Physical Address View project details and contacts
City, State (County) Hinesville, GA 31310   (Liberty County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement rake screen to replace the existing bar screen. The screen will be used to screen large chunks of wood, concrete and debris that may damage the downstream pumps. The work to be performed consists of furnishing all labor and materials to complete the Hinesville Pump Station Bar Screen Upgrade. More specifically, the project will consist of constructing a concrete basin approximately 30’ long, 8’ wide and 20.5’ deep with removable aluminum grates, connecting the concrete basin to an existing influent channel and manhole with approximately 30 LF of 30” diameter PVC pipe, installing a slide gate into the concrete channel, installing a 30” gate valve to the existing 30” DIP influent pipe, installing a Huber TrashMax bar screen (to be acquired separately by the City of Hinesville), removing and replacing approximately 55 SY of concrete pavement, and removing and replacing approximately 75 LF of chain-link fencing.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents