Similar Projects
Bexley North - Infrastructure
New Construction
Design
Inman, SC

Silver Steps Hiking Trail Construction
Post-Bid
$40,000 to $50,000 est. value
Greenville, SC 29635

Blythewood Pedestrian Railing System
Term Contract
Post-Bid
Blythewood, SC 29016

Columbia Avenue Pedestrian Improvements
Results
Rock Hill, SC

Edgemont Parking Lot Construction
Results
Less than $294,010 est. value
Rock Hill, SC

CVS #2555 - ADA Site Renovations
Renovation - 4,500 SF
Construction
Gaffney, SC 29341

CVS #3565 - ADA Site Renovation
Renovation - 10,186 SF
Construction
Cheraw, SC 29520

Martin Luther King Jr. Boulevard (S-17-96) Sidewalk Improvements
Post-Bid
Dillon, SC

Little Mountain Elementary Walking Track
Results
Little Mountain, SC 29075

Repairs to Walking Tracks
Post-Bid
Marion, SC 29571

Greenway Trail Project - Phase 2B
Results
Green Pond, SC

Oscar Frazier Park Field of Dreams Walkway
Post-Bid
Bluffton, SC 29910

Baseball Alley Realignment and Improvements
Results
Less than $464,046 est. value
Chester, SC

Bay Creek Park Parking Lot Improvements
Post-Bid
$15,000 to $30,000 est. value
Edisto Island, SC 29438

Concrete Drives
Results
Gray Court, Waterloo, SC 29645

Last Updated 11/28/2020 04:55 AM
Project Title

SC 64 Pedestrian Enhancement

Physical Address View project details and contacts
City, State (County) Walterboro, SC 29488   (Colleton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of curb, gutter, sidewalk, and drainage improvements approximately 3400 linear feet on SC 64 and approximately 1400 on Widgeon Road both of which are SCDOT roadways in Walterboro. Roadways must be open to traffic at all times during construction. Utilities may be present along certain roads. It will be the responsibility of the contractor for coordination with the local utility providers and for making the necessary adjustments. All road work is to be performed within the existing or obtained Right-of-Way of the road and construction easements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents