Project Title | RFQ - Forsyth Technical Community College - Main Campus Renovations |
Physical Address | View project details and contacts |
City, State (County) | Winston Salem, NC 27103 (Forsyth County) |
Category(s) | Education |
Sub-Category(s) | College/University |
Contracting Method | Competitive Bids |
Project Status | Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $12,000,000 [brand] Estimate |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | AS of August 10, 2022, an awarded construction manager has been selected. Original budget for this project was $14,525,000 but is now estimated at $12,000,000. The following bid packages have been released. An RFQ deadline has been announced but not a bid due date. PLEASE NOTE: - Only prequalified bidders will receive bid documents, plans and final bid date. This notice is for the RFQ portion of the project only. - The documents posted on this job are not complete. 02A Interior demolition, 03A Concrete, 04A Masonry, 05A Metals, 06A Casework and Millwork, 07A Roofing, 07B Fireproofing, 08B Counter Doors, 08C Glass Assemblies, 09A Drywall / Acoustical Assemblies, 09B Floor Coverings, 09C Paint and Wall Coverings, 09D Epoxy Floor Coating, 10A Specialties, 10B Signage, 10D Operable Partitions, 11A Laboratory Equipment and Casework, 11B Food Service Equipment, 12A Window Treatments, 14A Elevators, 18A General Works, 18B Final Cleaning, 21A Fire Protection, 22A Plumbing Systems, 23A HVAC Systems, 26A Electrical Systems. The scope of the project consists of 69,267 square feet of interior up fit to their existing main campus building. The program spaces will include nursing, birthing & medication labs, a wellness center, campus bookstore, computer & tutoring labs, administrative & cashier offices, veterans, women, & minority mentoring centers, new restrooms, testing center, chemistry lab, science & general classrooms, and a conference center with full kitchen. The renovated facility will serve FTCC for many years to come. The existing building is structurally sound and currently in use. The existing building is sprinklered and will remain so. The building is type IB construction, protected steel frame. A portion of interior partitions will be demolished, while all load-bearing structure will remain unchanged; slab openings will be made for an elevator shaft & various PME penetrations, with added structural support. The exterior appearance is to remain unchanged. Materials selected for this building will complement the existing building as well as include materials used by the Owner on similar projects across the campus to provide cohesiveness for various building designs. The interior partition walls will typically be 3-5/8 inch or 6 inch metal stud with GWB. The building will have either open, gwb, or acoustical lay-in ceilings. The floor finishes are to match the remainder of the building - carpet tile, vct, epoxy resinous, & sealed concrete. Restrooms will have ceramic tile floor and partial ceramic tile wall finish. |
||||||||||||||||||||||||||||||||||||||
Details | 69,367 SF.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |