Similar Projects
Power City and Brownell Area Water Design and Construction - City of Umatilla
Infrastructure
Conception
$8,086,500 CJ est. value
Umatilla, OR 97882

New Career Technical Education Building - 2022 Bond - Umatilla School District
Addition, Demolition, New Construction, Infrastructure
Conception
$45,200,000 CJ est. value
Umatilla, OR 97882

US 730/4.4 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$2,721,000 CJ est. value
McNary, OR 97882

Eastern Oregon variable message signs
Infrastructure
Design
$1,069,175 CJ est. value
Pendleton, OR 97801

Maxwell Canal Pump Station and Pipeline Project
Infrastructure
Bidding
$600,000 CJ est. value
Hermiston, OR 97838

High School Parking Lot Paving Project
Infrastructure
Bidding
$460,000 CJ est. value
Athena, OR 97813

RFQ Contractor - McNary Dam Navigation Lock Crane Replacement
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Umatilla, OR 97882

Camp Umatilla Entry Gate Improvements - Phase 2 and 3
New Construction, Infrastructure
Post-Bid
$2,479,000 CJ est. value
Hermiston, OR 97838

Regional Water System Improvements Phase 1 - 2023
Renovation, Infrastructure
Results
$2,808,813 CJ est. value
Hermiston, OR 97838

OR204: Little Phillips Creek Emergency Culvert Replacement Project Weston-Elgin Highway
Infrastructure
Results
$1,349,483 CJ est. value
Weston, OR 97886

South Hill Commons - New Multi-family Affordable Housing Project
New Construction, Infrastructure - 172,202 SF
Construction
$47,000,000 CJ est. value
Pendleton, OR 97801

Sterling Ridge Apartments
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Hermiston, OR 97838

Horizon Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hermiston, OR 97838

New 4-6 School Building on South Hill - 2022 Bond - Umatilla School District
Addition, Demolition, New Construction, Infrastructure
Conception
$45,200,000 CJ est. value
Umatilla, OR 97882

Pendleton Signal Upgrade Project Phase II
Infrastructure
Design
$1,510,129 CJ est. value
Pendleton, OR 97801

Last Updated 05/08/2023 05:02 PM
Project Title

Umatilla Marina & RV Park Improvements - Design Phase - City of Umatilla

Physical Address View project details and contacts
City, State (County) Umatilla, OR 97882   (Umatilla County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Site Development
Contracting Method Competitive Bids
Project Status Seeking Funding, Construction start expected May 2026
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design of an all new state-of-the-art marina. The new marina will include covered single-berth slips, uncovered single-berth slips, aluminum or steel framed docks, engineered decking or concrete, encapsulated floats, well-spaced navigable fairways, electrical hookups at each slip, high speed internet, and other features and amenities. Fiscal Year: 2022-2023 As of May 8, 2023, a design team has not been identified. A construction timeline has not been established yet. Though estimated the permitting process can take several months to a year. It will take a minimum of three years (most likely 4-5) for construction starting. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents