Similar Projects
Worden Park-East Playground - City of Royal Oak
Renovation, Infrastructure
Conception
$300,000 est. value
Royal Oak, MI 48073

2023 Water Main Improvements - CAP2310 - City of Royal Oak
Infrastructure
Conception
$1,400,000 est. value
Royal Oak, MI

2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

Concrete Shared-use Path, Curb, Gutter, Sidewalk and Ramps, Storm Drain and Pavement Markings on Woodward Avenue
Infrastructure
Design
$2,739,086 CJ est. value
Pleasant Ridge, MI 48069

Concrete Reconstruction, Concrete Curb and Gutter, Sidewalks, Sidewalk Ramps, Culverts, Sewer, Drainage, Steel Piling, Steel Sheet Piling, Cofferdams, Guardrail Work, Signage
Demolition, New Construction, Infrastructure
Bidding
$215,153,000 CJ est. value
Oak Park, MI 48237

Concrete Reconstruction, Concrete Curb and Gutter, Sidewalks, Sidewalk Ramps, Culverts, Sewer, Drainage, Steel Piling, Steel Sheet Piling, Cofferdams, Guardrail Work, Signage
Demolition, New Construction, Infrastructure
Bidding
$215,153,000 CJ est. value
Oak Park, MI 48237

Hess Hathaway Animal Fencing
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Waterford, MI 48327

By-Pass Pumping and Dewatering Services
Term Contract
Sub-Bidding
Waterford Township, MI 48329

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

FPE Cip Paving 2021
Infrastructure
Post-Bid
Waterford Township, MI 48328

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Butler Road Rehabilitation Program
Results
Rochester Hills, MI 48306

Sakura Novi Mixed-Use
New Construction, Infrastructure - 44,000 SF
Pending Verification
$65,000,000 CJ est. value
Novi, MI 48375

Gasow Veterinary Hospital
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Birmingham, MI 48009

Streambank Stabilization - Middle Rouge (Between Novi Road And Ten Mile Road) - ENG071 - City Of Novi
Infrastructure
Conception
Novi, MI

Last Updated 08/15/2022 11:33 PM
Project Title

Long Lake Road Emergency Sewer Replacement

Physical Address View project details and contacts
City, State (County) Bloomfield Township, MI 48302   (Oakland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $2,599,599 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Install new 16" diameter, ductile iron pipe sanitary sewer and two sanitary manhole structures supported on pipe piles to replace the existing sheet pile-supported sanitary sewer. Approximate length of new sewer is 462 feet, and includes fabrication of cradle support system, continuous by-pass pumping of sanitary sewerage during project, and reconnection of 3 sanitary sewer services. 152 pipe piles, including two test piles, are proposed to be driven to an average depth of 45 feet below the sewer. This project shall include all pavement restoration, surface restoration, traffic control, soil erosion control and other miscellaneous items necessary to complete the work as indicated on the Plans and Specifications. Bidders are advised that to submit a proposal on this project, original documents purchased from Hubbell, Roth, & Clark, Inc. must be used. Proposals submitted by Bidders who have been debarred, suspended, or made ineligible by any Federal Agency will be rejected. All bidders must meet the requirements set forth in the Township's prequalification statement. The Township will require at least three (3) satisfactory municipal references for similar work as a prime contractor over the last five (5) years for all contracts with a value of greater than $500,000.00. The prime contractor or subcontractors to be used on this project must demonstrate experience installing a minimum of 5,000 feet of sanitary sewer by open-cut method. The prime contractor or subcontractors to be used on this project must demonstrate experience installing and operating a bypass pumping system. It is the intention of Bloomfield Township to award this Contract to a qualified contractor with experience on at least one (1) pile-supported sewer or water main project. General Requirements - Bid Deposit Required - Insurance Required Bid Bond 5 % - Installation Required

Details

Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents