Similar Projects
Marianna Demolition LS 17-08
Results
PA

Demolition of a Commercial Structure
Demolition
Post-Bid
McMurray, PA

Monongahela (Emergency) Demolition
Results
Less than $39,900 est. value
Washington, PA

East Bethlehem Demolition Project
Results
Washington, PA

Independence Township Demolition Project
Results
Washington, PA

Charleroi Demolition
Demolition
Results
Charleroi, PA 15022

Modular Classroom and Church Demolition at the Ringgold Elementary School North
Demolition
Results
Finleyville, PA 15332

The Washington Area Business Incubator (WABI) - Observer Reporter Site Selective Demolition & Asbestos Abatement
Demolition
Post-Bid
Washington, PA 15301

Washington Demolition Project
Demolition
Results
Washington, PA 15301

Construction - Boiler Demo - Washington PA
Results
Less than $25,000 est. value
Washington, PA 15301

California Demolition
Demolition
Results
Washington, PA

Canonsburg and Cecil Demolition Project
Demolition
Results
Washington, PA

California Demolition
Demolition
Results
Washington, PA

Canton and Carroll Demolition
Demolition
Results
Washington, PA

House Demolition LSA
Demolition
Results
California, PA 15419

Last Updated 02/25/2019 10:56 AM
Project Title

Demolition of 30/32 and 34 Birch Way

Physical Address View project details and contacts
City, State (County) Cecil, PA   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Demolition of the structures located a 30, 32, and 34 Birch Way. The scope of work will include complete removal of the structures including foundations, footers, and floor, building contents, trees, vegetation, removal of parking pads/platforms, retaining walls, on lot concrete walkway, steps, removal and disposal of everything on the property, and disconnection of and capping of utilities. Property shall be seeded and mulched upon completion of demolition.All biodegradable and combustible materials generated from the demolition shall be removed and disposed of at an approved offsite facility. Clean fill shall be used for the backfill of the building foundation to grade the property to a consistent grade that blends with the surrounding ground. All biodegradable and combustible materials generated from the demolition shall be removed and disposed of at an approved offsite facility. Clean fill shall be used for the backfill of the building foundation to grade the property to a consistent grade that blends with the surrounding ground.
Details
Division 02 - Existing Conditions, Demolition.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents