Similar Projects
RR-21-4577 - Plaza Improvements
Bidding
Downers Grove, IL

Resurfacing Eola Road from Oakhurst Drive to US 34 in Aurora
Bidding
Aurora, IL 60505

Supply of Asphalt Emulsion, Sealer Materials
Term Contract
Post-Bid
West Chicago, IL 60185

Poly Fiber Firm Asphalt Crack Sealant Material
Post-Bid
Downers Grove, IL 60515

Gregory Avenue and Somerset Drive Reconstruction
Results
$1,081,025 est. value
Glendale Heights, IL 60139

Three School Asphalt Paving
Results
Naperville, IL 60540

Devon-Park-Pierce Intersection Improvements
Pending Verification
Itasca, IL 60143

Resurfacing, Curb And Gutter, Traffic Signals, Sidewalks And Pavement Markings On Grand Avenue, From US 20 To County Line Road In Elmhurst And Bensenville
Bidding
Bensenville, Elmhurst, IL

Crack Sealing Bituminous Pavement
Term Contract
Post-Bid
Addison, IL 60101

2020 Wayne MET Road Program
Results
Less than $275,000 est. value
Wayne, IL 60184

(3.9-Mile) Crack and joint sealing on US 20 (Lake Street)
Bidding
Addison, IL 60101

20-110 Hot-Mix Asphalt Surface Removal
Term Contract
Post-Bid
Wheaton, IL 60187

2020 Paving
Results
$196,500 est. value
Wheaton, IL 60189

Hot-Mix Asphalt
Bidding
Naperville, IL

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

Last Updated 04/15/2021 07:27 AM
Project Title

Pennsylvania Avenue Improvement

Physical Address View project details and contacts
City, State (County) Glen Ellyn, IL 60137   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes installation of approximately 200 feet of 42” RCP storm sewer, 30 feet of 12”-27” RCP storm sewer, 4 storm manholes, 3 water services with new buffalo boxes, 2165 square feet of PCC sidewalk, 290 feet of concrete curb and gutter, 150 tons of HMA binder and surface course, 205 feet of underground electric conduit, 135 square feet of clay brick pavers and all incidental and collateral work necessary to complete the project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents