Similar Projects
Last Updated | 02/09/2022 03:01 PM |
Project Title | Bloomfield at STH 120 Traffic Signal |
Physical Address | View project details and contacts |
City, State (County) | Lake Geneva, WI (Walworth County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Location:At the intersection of STH 120/Edwards Blvd. and Bloomfield Road. The Base Bid work for the above contract includes the installation of a new traffic signal on Bloomfield Road at STH 120 (Edwards Boulevard) and intersection improvements on Bloomfield Road from approximately 415’ west of STH 120 to 540’ east of STH 120. Major work items and approximate quantities for which bids are requested include 964 CY of Excavation Common, 185 tons of Select Crushed Material, 1,200 tons of Base Aggregate Dense 1 ¼ Inch, 500 tons of Base Aggregate Dense ¾ Inch, 99 SY Concrete Pavement 9-Inch, 210 SY of Concrete Pavement Repair, 244 tons of HMA Pavement, 59 tons of Asphaltic Surface, 377 LF of Concrete Curb and Gutter, 232 SF of Concrete Sidewalk 5-Inch, 44 SF of Detectable Warning Field, 128 LF of Storm Sewer Pipe Reinforced Concrete, erosion control, permanent signing, traffic control, pavement marking, street lighting, traffic signals, and landscape restoration. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |