Similar Projects
Traffic Signal Improvements
Infrastructure
Bidding
Greenfield, WI 53220

Light Pole Fixtures
Term Contract
Post-Bid
La Crosse, WI

Exterior Bus Stop Signs
Post-Bid
Appleton, WI

Dump Station Reconfiguration/Relocation GPC
Renovation
Results
Kansasville, WI

Sunny Slope Road and Grange Avenue
Results
$1,949,105 est. value
New Berlin, WI 53146

Traffic Safety Improvements
Infrastructure
Post-Bid
Milwaukee, WI

Appleton Avenue (STH 175) and Woosencraft Way Traffic Signal Replacement and Intersection Improvements
Results
Less than $280,000 est. value
Menomonee Falls, WI 53051

Cable - Traffic Signal
Infrastructure
Post-Bid
Milwaukee, WI

CTH N & Evergreen Drive Traffic Signal Installation
Results
Kaukauna, WI 54130

Traffic Signal Led Modules
Infrastructure
Post-Bid

Traffic Signal Improvements - 16th Street and Lathrop
Infrastructure
Results
$150,000 to $200,000 est. value
Racine, WI 53400

Work Zone Traffic Control Items
Infrastructure
Post-Bid

Traffic Calming and Arterial Pedestrian Enhancements - 2021
Infrastructure
Results
$370,000 est. value
Madison, WI

CTH M/CTH PB Intersection Expansion Project
Infrastructure
Post-Bid
$1,300,000 est. value
Vernon, WI

Audible Pedestrian Equipment
Term Contract
Results
Milwaukee, WI

Last Updated 02/09/2022 03:01 PM
Project Title

Bloomfield at STH 120 Traffic Signal

Physical Address View project details and contacts
City, State (County) Lake Geneva, WI   (Walworth County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location:At the intersection of STH 120/Edwards Blvd. and Bloomfield Road. The Base Bid work for the above contract includes the installation of a new traffic signal on Bloomfield Road at STH 120 (Edwards Boulevard) and intersection improvements on Bloomfield Road from approximately 415’ west of STH 120 to 540’ east of STH 120. Major work items and approximate quantities for which bids are requested include 964 CY of Excavation Common, 185 tons of Select Crushed Material, 1,200 tons of Base Aggregate Dense 1 ¼ Inch, 500 tons of Base Aggregate Dense ¾ Inch, 99 SY Concrete Pavement 9-Inch, 210 SY of Concrete Pavement Repair, 244 tons of HMA Pavement, 59 tons of Asphaltic Surface, 377 LF of Concrete Curb and Gutter, 232 SF of Concrete Sidewalk 5-Inch, 44 SF of Detectable Warning Field, 128 LF of Storm Sewer Pipe Reinforced Concrete, erosion control, permanent signing, traffic control, pavement marking, street lighting, traffic signals, and landscape restoration.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents