Similar Projects
2023 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

2023 Bond - Central School District 301
New Construction, Infrastructure, Renovation
Conception
$195,000,000 CJ est. value
Sycamore, IL 60178

First United Methodist Church
New Construction, Infrastructure - 10,986 SF
Design
$600,000 CJ est. value
Dekalb, IL 60115

Remove and Replace a Portion of the Aircraft Parking Apron
Infrastructure
Bidding
$500,000 CJ est. value
Dekalb, IL 60115

Remove and Replace a Portion of the Aircraft Parking Apron
Infrastructure
Bidding
$500,000 CJ est. value
Dekalb, IL 60115

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Dresser Road Shared Use Path
Infrastructure
Results
$308,495 est. value
Dekalb, IL

Dresser Road Shared Use Path
Infrastructure
Results
$302,768 est. value
De Kalb, IL

RFQ Design - Construct Northern Illinois Center for Community Sustainability
New Construction, Infrastructure - 30,000 SF
Pending Verification
$15,000,000 CJ est. value
Dekalb, IL 60115

Fisk Avenue Multi-Residential Development
Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Dekalb, IL 60115

Construction Management Services
New Construction, Infrastructure
Bidding
$24,000,000 CJ est. value
Dekalb, IL 60115

Snow Plow Service 2021-2022
Term Contract
Post-Bid
Sandwich, IL

Ellwood House Museum Grounds Grant Project
Infrastructure
Results
$300,000 est. value
Dekalb, IL 60115

DeKalb Township - Rich Road Drainage Imps
Infrastructure
Bidding
$146,000 CJ est. value
Dekalb, IL 60115

Last Updated 04/12/2023 08:13 PM
Project Title

2023 Water Main Improvement

Physical Address View project details and contacts
City, State (County) Sycamore, IL 60178   (DeKalb County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,513,287 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

o Horizontal Directional Drilled Water Main (8" and 10"). o Water Service Connections / Lead Service Replacement. o Valves, Vaults, Frames, Lids and Appurtenances. o Testing and Chlorination of New Water Main. o Abandon Existing Water Main. o Turf, Pavement, Curb & Gutter, Sidewalk, Etc. Replace- Ment. o Other Work as Described Within the Plans and Specifi- Cations. Questions Should Be Directed to Bids@cityofsycamore.com Each Bid Shall Be Accompanied by a Bid Bond, Bank Draft, Cashier's Check or Certified Check Payable to the Order of the City of Sycamore, Illinois in an Amount Not Less Than Ten (10) Percent of the Amount of the Bid, as a Guaranty That the Bidder Will Execute the Contract, if It is Awarded, in Conformity With the Bid Form. B. The Successful Bidder Will Be Required to Furnish Performance and Payment Bonds on Forms Provided in the Specifications and Contract Documents, in an Amount Equal to 110 Percent and 100 Percent of the Contract Sum, Respectively. 1.5 Wage Rates a. The Contractor Shall Pay Prevailing Wages in Accordance With the Prevailing Wage Act, 820 Ilcs 130/0.01. 1.6 Rejection of Bids a. The Owner Expressly Reserves the Right to Reject Any or All Bids or to Accept the One, Which Appears to Be in the Best Interest of the Owner. The Owner Expressly Reserves the Right to Waive Any Informalities or Technical Irregularities in a Bid if to Do So is in the Best Interest of the Owner. Work of this proposed Contract comprises replacing 3,432 feet of water main along DeKalb Ave, Sacramento St., and Elm St.; and all other appurtenant work and materials necessary to complete the project as specified. B. Location: DeKalb Ave, Sacramento St., and Elm St

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents