Similar Projects
Last Updated | 08/09/2019 06:27 AM |
Project Title | Drainage |
Physical Address | View project details and contacts |
City, State (County) | (Holmes, Walton, Washington Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract consist of the placement of Bank and Shore Riprap-Rubble as well as Ditch Lining Rubble along various roadways in Holmes, Walton and a portion of Washington Counties. This rubble will be used to fill, re-contour and restore eroded slope and ditch bottoms. Periodic lane closures will be required. Lane closures may be performed between 8:00 am and 3:00 pm with prior approval of the Engineer. Removal and replacement of guardrail may be necessary to accomplish dumping and spreading of rubble. All guardrail to be replaced at end of each work day. Mobilization, Maintenance of Traffic and removal & replacement of guardrail. Section 0001 Asphalt Repair (Mechanical) (Tn) 0104- 10- 3 Sediment Barrier Lf 300.000 0104- 11- Floating Turbidity Barrier Lf 1,000.000 0120- 2- 2 Borrow Excavation, Truck Measure Cy 400.000 0339- 1- Miscellaneous Asphalt Pavement Tn 15.000 0530- 3- 3 Riprap- Rubble, Bank And Shore Tn 1,600.000 0530- 3- 4 Riprap, Rubble, f&i, Ditch Lining Tn 900.000 0530- 3- 9 Riprap- Rubble, Remove Existing And Reinstall - Push Button Only Sf 10,000.000 0530- 74- Bedding Stone Tn 1,600.000 0570- 1- 2 Performance Turf, Sod Sy 500.000 | ||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |