Similar Projects
Improvements to Post Lane, Munn Avenue and Cottage Place
Infrastructure
Bidding
$600,000 to $640,000 est. value
Ridgewood, Riverdale, NJ 07457

ESCO Energy Savings Improvements
Alteration
Bidding
Pompton Plains, NJ

Brook Lawn Drive Improvement Project
Post-Bid
Long Valley, NJ 07853

Reconstruction of Various Streets in Mount Tabor, Phase V
Post-Bid
Parsippany, NJ 07054

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Proposed Improvements to Granniss Avenue
Results
Morris Plains, NJ 07950

Resurfacing of Hillside Avenue from Maple Street to Watchung Avenue (CR-646)
Infrastructure
Bidding
Chatham, NJ 07928

Asphalt Paving
Post-Bid

Improvements to Waughaw Road Project
Results
Montville, NJ 07045

LED and Other Lighting Purchase & Installation
Alteration
Bidding

Led Price Sign Fabrication & Installation At Twenty-Four (24) Lna Service Stations
Post-Bid

Two Bridges Wastewater Treatment Plant Site Restoration
Results
$300,000 est. value
Lincoln Park, NJ 07035

Generator Maintenance and Repair of the Riverview Apartments
Post-Bid
Boonton, NJ 07005

Proposed Improvements to Taft Avenue, Polk Court and Garfield Avenue
Results
$68,999 est. value
Victory Gardens, NJ 07801

Bathroom Accessibility Improvements
Post-Bid
Roxbury, NJ 07836

Last Updated 11/10/2021 01:27 PM
Project Title

Main Avenue Streetscape Project - Long Hill Township

Physical Address View project details and contacts
City, State (County) Gillette, NJ 07933   (Morris County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $407,291
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes the installation of streetscape improvements consisting of 20 new decorative lighting standards, with 2 luminaires per standard; construction of a new meter cabinet and a new electrical service; construction of 1,825 linear feet of conduit and associated wiring for the installation of the new decorative lighting; modification of an existing signal to install a wireless vehicle detection system, including the replacement of the traffic signal controller; conversion of lamps on existing light standards to LED fixtures; and installation of street furniture including benches, planters and trash receptacles. The project also includes the removal of 822 square yards of concrete pavement and restoration with Hot Mix Asphalt Pavement Repair; reconstruction of 191 square yards of concrete driveway aprons and 814 linear feet of Belgian block curb associated with the installation of the new decorative lighting; construction of 191 square yards of concrete sidewalk, 6" thick and 558 linear feet of concrete vertical curb to provide ADA-compatible curb ramps; installation of traffic stripes, and other incidental work along Main Avenue.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents