Similar Projects
Energy and Engineering Innovation Center - California State University - Bakersfield
New Construction, Infrastructure
Conception
$75,984,000 CJ est. value
Bakersfield, CA 93311

Energy and Engineering Innovation Building - California State University System
New Construction, Infrastructure - 49,000 SF
Conception
$83,175,000 CJ est. value
Bakersfield, CA 93311

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Design Built-Paving IDIQ
Infrastructure
Design
Edwards Air Force Base, CA

2022 Larry Itliong Unity Park
Infrastructure, Renovation
Bidding
$3,100,000 CJ est. value
Delano, CA 93215

2022 Larry Itliong Unity Park
Infrastructure, Renovation
Bidding
$3,100,000 CJ est. value
Delano, CA 93215

Constructing Pipeline and Pump Station Project
Infrastructure
Post-Bid
Bakersfield, CA 93314

Remove and Replace 0.25 HMA Type A
Infrastructure
Post-Bid
$210,000 est. value
CA

Cold Plane Ac and Overlay with Hma and Rhma-G
Infrastructure
Results
$6,000,000 est. value
CA

Traffic Signal At Lake Isabella Boulevard And Elizabeth Norris Road
Infrastructure
Results
$754,768 est. value
Lake Isabella, CA 93240

Pavement Repair (CAPM)
Infrastructure
Design
$7,560,000 est. value
Mojave, CA 93501

2022 Delano Aquatic Center
New Construction, Infrastructure - 4,149 SF
Bidding
$5,900,000 CJ est. value
Delano, CA 93215

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Road Resurfacing on South Union Avenue from Panama Road to Bakersfield City Limits
Infrastructure
Results
$1,418,186 est. value
Bakersfield, CA

2-Lane Conventional Highway to a 4-Lane Expressway
Infrastructure
Design
$29,400,000 CJ est. value
Lost Hills, CA 93249

Last Updated 08/12/2022 09:07 AM
Project Title

Walmart Warranty Work Project

Physical Address View project details and contacts
City, State (County) Tehachapi, CA 93561   (Kern County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $194,001 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 25, 2022, this project has been awarded to R. C. BECKER AND SON, INC., IN THE AMOUNT OF $194,000.90 Furnishing to said CITY of all transportation, labor, materials, tools, equipment, services, permits, utilities, and other items necessary to construct said work. The work includes miscellaneous construction punch list work for the City's Walmart Development and surrounding areas and includes repair work to: street and bike path signage, street and bike path striping, storm drain inlet, landscaping, median nose signs, guardrail, gates, bike path asphalt pavement, curb and gutter, concrete work, valve box lid, and a back flow preventer. Each bid shall be submitted on a form furnished as part of the Contract Documents and must be accompanied by cash, a cashier's check, a certified check, or a Bidder's bond executed by an admitted surety insurer, or substitute pursuant to Section 995.710 of the Code of Civil Procedure, in an amount not less than 10% of the amount of the bid, made payable to the order of or for the benefit of the CITY. The security of unsuccessful Bidders will be returned by the CITY no later than sixty (60) days following the date of award. The City Council has obtained from the Director of the California Department of Industrial Relations a determination of the general prevailing rate of per diem wages and the general prevailing rate for legal holiday and overtime work in the locality in which said work is to be performed for each craft, classification, or type of worker needed. Not less than the determined rates shall be paid to all workers employed in the performance of the contract. Such rates of wages are on file with the Department of Industrial Relations and in the office of the CITY and are available to any interested party upon request. These classifications are provided for information purposes only. The Engineer does not warrant that all classifications required for the project are listed. The Bidder is required to sign the attached Noncollusion Affidavit and submit it with his bid. Ryan Waski at AECOM via email at ryan.waski@aecom.com or phone at (661) 283-2329. The City Council of the CITY reserves the right to select the schedule(s) under which the bids are to be compared and contract(s) awarded, to reject any and all bids, and to waive any and all irregularities in any bid. This section generally describes the project and includes work sequence and schedule, Contractor's use of premises, Owner occupancy, maintenance and operation of existing facilities, permits, and regulations.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents