Similar Projects
Capital Transportation Improvement Plan - Rice County
New Construction, Infrastructure
Conception
$102,000,000 CJ est. value
Faribault, MN 55021

Carlton County Jail
New Construction - 55,200 SF
Design
$34,000,000 est. value
Carlton, MN 55718

Asbestos Abatement - Federal Correctional Institution (FCI) Sandstone
Term Contract, Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Sandstone, MN 55072

Staff Housing Fence Removal and Installation - Federal Correctional Institution (FCI) Sandstone
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Sandstone, MN 55072

Wireless and Re-cable at Oak Park Heights
Renovation
Sub-Bidding
$600,000 CJ est. value
Oak Park Heights, MN 55082

Northwest Minnesota Juvenile Center
New Construction
Post-Bid
Bemidji, MN 56601

New Winona County Jail Building
New Construction
Post-Bid
Winona, MN 55987

ACF Men's Campus Updates
Renovation
Results
Plymouth, MN 55447

Replace Two Elevators at MCF - General
Renovation
Results
$944,835 est. value
Moose Lake, MN 55767

Construction Manager - Rice County Jail and Law Enforcement Center
New Construction
Post-Bid
$49,000,000 est. value
Faribault, MN 55021

Law Enforcement Center 3100 and 7100 Cell Block Improvements
Renovation
Results
$500,000 est. value
Hastings, MN 55033

Winona County Jail - Detention Equipment Package
New Construction, Alteration
Post-Bid
Winona, MN 55987

Community Corrections Lobby Upgrades
Renovation
Results
$185,000 est. value
Apple Valley, Hastings, West Saint Paul, MN 55124

General Construction
Term Contract
Post-Bid
MN

Building Improvements MCF - Togo
Renovation
Results
$931,181 est. value
Cook, MN 55723

Last Updated 08/08/2022 07:31 PM
Project Title

HVAC, Electrical, Window Upgrade in the J3 Building at MCF Lino Lakes

Physical Address View project details and contacts
City, State (County) Lino Lakes, MN 55014   (Anoka County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $554,778 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

State Project Number 78LL0055 Building J3 HVAC, Electrical, and Window Upgrade at MCF Lino Lakes This project is Targeted Group/Economically Disadvantaged/Veteran-Owned (TG/ED/VO) certified small business preference and has a 2% TG/ED/VO subcontracting goal.> A. The work will done under one prime contract that includes: General, Electrical, and Mechanical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Demolition and replacement of the existing HVAC system in a wing of the J3 Building. 2.) Demolition and replacement of the existing attic insulation and vapor barrier in a wing of the J3 Building.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents