Similar Projects
Dunloggin Middle School Renovation and Addition - E1049 - Howard County Public School System
Addition, Renovation, Infrastructure
Conception
$59,782,000 CJ est. value
Ellicott City, MD 21042

Manor Woods Elementary School Waste Water Treatment Plant - Howard County Public School System
Infrastructure
Conception
$6,000,000 est. value
Ellicott City, MD 21042

Troy Park and Historic Rehabilitation Phase III - N3957 - Howard County
New Construction, Infrastructure
Design
$35,470,000 CJ est. value
Ellicott City, MD 21043

Hammond Patuxent Interceptor Improvements - S6280 - Howard County
Renovation
Design
$24,200,000 CJ est. value
Columbia, MD 21046

Stormwater Management Facilities Inspection
Term Contract
Bidding
Ellicott City, MD 21042

Roadways, Intersections and Sidewalk Construction Improvements
Infrastructure
Bidding
$160,000 CJ est. value
Columbia, MD 21046

Milestone Senior Development / Jessup (Civil Work)
New Construction, Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Jessup, MD 20794

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Ellicott City North Tunnel Project - Howard County
Infrastructure
Post-Bid
$70,000,000 CJ est. value
Ellicott City, MD 21043

Fire Hydrant Repair Program
Term Contract
Results
$4,000,000 est. value
Columbia, MD

Drainage Outfall Rehabilitation
Infrastructure
Results
$2,793,273 CJ est. value
Baltimore, MD 21202

Roslyn Rise Redevelopment
New Construction, Infrastructure
Construction
$45,000,000 CJ est. value
Columbia, MD 21044

North Slope Boardwalk Site
Alteration
Construction
Columbia, MD 21045

Hickory Ridge Village Center
New Construction, Infrastructure - 359,736 SF
Pending Verification
$70,000,000 CJ est. value
Ellicott City, MD 21043

School Route Pathways or Sidewalks - K5035 - Howard County
Infrastructure
Pending Verification
$3,873,000 CJ est. value
Ellicott City, MD 21043

Last Updated 04/24/2023 01:10 PM
Project Title

MD108 Pump Station Outfall Improvements - S6285 - Howard County

Physical Address View project details and contacts
City, State (County) Ellicott City, MD 21043   (Howard County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $4,810,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A project for the design and construction of 1,585 feet of parallel sewer in the Tiber Branch sewer drainage area to support flows from the MD108 Pumping Station. This project is included in the county's fy 2023-2028 Capital Improvement Program. As of April 24, 2023, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents