Similar Projects
I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

South End Road MP 3.8
Infrastructure
Results
$330,000 to $340,000 est. value
Oregon City, OR

Webster Area Paving Project
Infrastructure
Results
$775,000 est. value
Oregon City, OR

Mount Tabor Yard Maintenance Facility and Multimodal Pathway Project
New Construction
Construction
$13,500,000 est. value
Portland, OR

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Waluga Pressure Zone Pipe Resiliency Improvements: (R- 01) - City of Lake Oswego
Infrastructure
Conception
$1,140,000 CJ est. value
Lake Oswego, OR 97035

OR 224 at SE Monroe St
Infrastructure
Design
$3,077,537 CJ est. value
Estacada, OR 97023

Salmonberry Drive Paving Project
Infrastructure
Post-Bid
$200,000 est. value
Oregon City, OR 97045

Last Updated 07/10/2023 04:11 PM
Project Title

Mulino Paving Package

Physical Address View project details and contacts
City, State (County) Oregon City, OR 97045   (Clackamas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,912,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work contemplated under this contract with the Owner, includes all labor, materials, transportation, equipment and services necessary for, and reasonably incidental to, the completion of all construction work in connection with the project described in the Project Manual which includes, but is not necessarily limited to, the Notice of Public Improvement Contract Opportunity Prevailing Wage Rates requirements apply to this Project because the maximum compensation for all Owner-contracted Work is more than $50,000. Contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870, relative to Prevailing Wage Rates. The Bureau of Labor and Industries (BOLI) wage rates and requirements set forth in the following BOLI booklet (and any Clackamas Contract Form B-1 (2/2023) listed amendments to that booklet), which are incorporated herein by reference, apply to the Work authorized under this Agreement Bid bonds must be executed on the County forms, which will be provided to all prospective Bidders by the Owner. The Bid bond shall be executed on behalf of a bonding company licensed to do business in the State of Oregon. The Owner reserves the right to reject all Bids and to waive minor informalities. The procedures for contract awards shall be in compliance with the provisions of the LCRB Rules in effect at that time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents