Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

Full Service Design IDIQ
New Construction
Design

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Job Order Services - Professional Services for Land Acquisitions
Term Contract
Bidding
CO

Survey and Mapping Architect-Engineering Services Nationwide
Post-Bid

CTE Architectural and Engineering Services
Post-Bid
Littleton, CO

C--CO, AZ and NM A/E Professional Services IDIQ
Results
$2,500 to $5,000,000 est. value

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Design Services for Police 100 Yard Range Paving and Erosion Control
Infrastructure
Bidding
$350,000 est. value
Aurora, CO 80011

Masonry Perimeter Fence-Design and Construction Engineering Services
Post-Bid
Centennial, CO

A/E Fire Protection Engineering IDIQ
Results

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Design
Less than $98,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Bidding

Energy Performance Contracting Services
Post-Bid
Centennial, CO

Last Updated 11/29/2021 04:38 PM
Project Title

High Line Canal Stormwater Capital Improvements and Operations Analysis

Physical Address View project details and contacts
City, State (County) Cherry Hills Village, CO   (Arapahoe County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Perform a comprehensive analysis of the High Line Canal Stormwater and Operations Master Plan as it pertains to the segment of Canal within Cherry Hills. The Master Plan documents and details the development of the hydrologic and hydraulic models of High Line Canal (Canal), identifies locations where stormwater is currently expected to overtop during large storm events, and recommends various alternatives to either mitigate or prevent these spills from occurring. The Master Plan also presents recommendations for operation of the Canal for water quality treatment while preserving the capability of the Canal to convey stormwater and support flood control operations.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents