Similar Projects
Last Updated | 11/29/2021 04:38 PM |
Project Title | High Line Canal Stormwater Capital Improvements and Operations Analysis |
Physical Address | View project details and contacts |
City, State (County) | Cherry Hills Village, CO (Arapahoe County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Perform a comprehensive analysis of the High Line Canal Stormwater and Operations Master Plan as it pertains to the segment of Canal within Cherry Hills. The Master Plan documents and details the development of the hydrologic and hydraulic models of High Line Canal (Canal), identifies locations where stormwater is currently expected to overtop during large storm events, and recommends various alternatives to either mitigate or prevent these spills from occurring. The Master Plan also presents recommendations for operation of the Canal for water quality treatment while preserving the capability of the Canal to convey stormwater and support flood control operations. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |