Similar Projects
Placentia Canal Drainage Improvements
Results
Savannah, GA 31401

Chatham Parkway Outfall Drainage and Access Improvements
Results
Savannah, GA 31416

Forest Lakes Drainage Canal Improvements
Results
Less than $388,340 est. value
Pooler, GA 31322

Norwood Avenue Drainage Improvements
Results
Savannah, GA 31416

Mims Street Drainage Improvements
Term Contract
Results
Savannah, GA 31416

Savannah Harbor DMCA 1N Dike Raising
Results
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Savannah Harbor DMCA 1N Dike Raising
Results
$1,000,000 to $5,000,000 est. value
Port Wentworth, Savannah, GA

Site Pavement and Erosion Repair
Post-Bid
Savannah, GA

Pipe Makers Canal Improvements - Division 1
Post-Bid
Pooler, GA

Pipe Makers Canal Improvements - Division 2 Canal Maintenance
Post-Bid
Pooler, GA

Roadway, Water, and Wastewater Improvements for theHardeeville Commerce Park
Post-Bid
Hardeeville, SC

Nottingham Canal Storm Drainage Improvements
Results
Savannah, GA 31404

Placentia Canal Drainage Improvements
Results
GA 31404

Ga-Wassaw NWR Expedite Bulkhead Wingwall
Post-Bid
$275,000 to $300,000 est. value
GA

SHEP Sediment Basin Rock Weir and Fill Design
Term Contract
Post-Bid
$25,000,000 to $50,000,000 est. value
Savannah, GA

Reported 07/15/2021 12:00 AM
Project Title

Ditching of Savannah Disposal Areas

Physical Address View project details and contacts
City, State (County) Savannah, GA 31401   (Chatham (GA) - Jasper (SC) County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project sites include Chatham County, Georgia and Jasper County, South Carolina. Ditching is required within the dredged material containment areas adjacent to Savannah Harbor, Georgia. The containment areas vary from several hundred to over a thousand acres with interiors of dredged sediments consisting of highly saturated soft silty soils interbedded with sand lenses overlying marsh deposits. The containment areas are kept water filled but drained for exterior dike raisings. Ditching begins as soon as possible in the drying areas. Ditching will be completed to expedite drying for surrounding dike raisings as required in the individual containment areas to protect against the breeding of mosquitoes and other pests. Historically, it is approximately 150,000 LF of ditching, 8ft wide by 6ft deep. Work will be intermittent due to the saturated condition of the containment areas. Transport of the excavator between containment areas includes using the Savannah River which is a tidal river with several knot currents. Therefore, a flotation equipped long reach excavator is required both to conduct the ditching and for transportation between containment areas.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents