Similar Projects
Steele Street Pump Station Upgrades - City of New Britain
New Construction, Infrastructure
Conception
$450,000 est. value
New Britain, CT 06052

Whites Bridge Pond Station Improvements - City of New Britain
Renovation
Conception
$6,000,000 est. value
New Britain, CT

Route 44 Sanitary Sewer Pump Station Rehabilitation - Town of Avon
Infrastructure
Design
$700,000 CJ est. value
Avon, CT 06001

Water Main Interconnection Project
Infrastructure
Design
$500,000 CJ est. value
Ridgefield, CT 06877

Route 44 Pump Station Upgrade
Renovation, Infrastructure
Bidding
$2,500,000 CJ est. value
Avon, CT 06070

Ferry Creek Pump Station Upgrades
Infrastructure
Bidding
$1,971,000 CJ est. value
Stratford, CT 06615

Vault B6 Pump Station
Infrastructure
Post-Bid
$326,777 CJ est. value
Storrs Mansfield, CT 06269

Goodwin Park Irrigation and Booster Pump Improvements
Infrastructure
Post-Bid
$1,450,000 CJ est. value
Hartford, CT 06114

Old Norwich Sewer Pump Station Upgrades
Renovation, Infrastructure
Results
$2,113,850 CJ est. value
Waterford, CT 06375

Construction Woodbridge Pump Station Rehabilitation
New Construction
Results
$784,406 est. value
Woodbridge, CT 06525

Wastewater Pump Stations Rehabilitation Project
Renovation
Pending Verification
$3,494,950 CJ est. value
Southington, CT 06489

Old Norwich PS (Station Rehab) - Town of Waterford
Renovation
Conception
$400,000 CJ est. value
Quaker Hill, CT 06375

Hopeville Water Storage Tank & Pumping Station
New Construction, Infrastructure
Bidding
$10,000,000 CJ est. value
Griswold, CT 06351

Sandy Hook Wastewater Pumpstation Upgrade
Renovation
Post-Bid
Newtown, CT 06482

Mauro Sheridan Booster Pump Replacement
Renovation
Results
$43,850 CJ est. value
New Haven, CT 06515

Last Updated 08/15/2023 04:07 PM
Project Title

Vernon Pump Station Upgrade (Town of Ellington)

Physical Address View project details and contacts
City, State (County) Vernon Rockvl, CT 06066   (Tolland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,713,969 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Ellington WPCA reserves the right to amend or terminate this Invitation to Bid, to reject any or all bids, The Project consists of the upgrade of the Town of Ellington Vernon Wastewater Pump Station at 100 Windsorville Rd, Vernon, CT. The pump station upgrade includes 215 LF of ductile iron force main piping with associated trench and pavement restoration, bypass pumping during construction. Replacement of 3 drypit submersible pumps and associated process piping, valves, piping supports. Upgrades to the HVAC,masonry re-pointing, roofing, wet well repairs, materials provided by owner, electrical, instrumentation and controls, hazardous material To expedite material procurement, the Ellington Water Pollution Control Authority pre-purchased the following equipment: 1-Sluice Gate with ancillary equipment, 1-Generator set, automatic transfer switch with ancillary equipment and 3-Sewage Pumps, VFD s, and control cabinets with ancillary equipment. Scope of work includes but is not limited to: Selective Demo, ACM Abatement, CIP Concrete, Maintenance of CIP concrete, Brick Masonry repair and repointing, metal cleaning, metal fabrications, metal grating and floor plates, Roof Preparation, Temp Roofing, EPDM Roofing, Steel window cleaning, FRP Doors and Fiberglass Resin transfer molded doors, floor doors, high performance coatings, room ID panel signage, Process I&C, Plumbing, HVAC, Electrical, Sitework, Bypass pumping. remediation, and ancillary items. Question Deadline 7-14-2023 Every request for such an interpretation shall be made in writing by a bidder and forwarded to: Attn: Ryan Morais Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040 Email: rmorais@fando.com Addendum #1-#3 have been issued as of 7-18-2023.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents