Similar Projects
Statement of Qualifications For HVAC And Electrical Contractors
Post-Bid
Conway, SC

Statement of Qualifications For HVAC And Electrical Contractors
Post-Bid
Conway, SC

Chiller Replacement - Coastal Evaluation Center
Results
Ridgeville, SC 29472

Repair HVAC Dormitory Building 2405 and 2406
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

HVAC Contractors
Term Contract
Post-Bid

Bryan/Morris Village Cooling Tower Piping Replacement
Results
$1,300,000 to $1,500,000 est. value
Columbia, SC 29203

Materials For Weatherization Assistance Program
Term Contract
Post-Bid

Greenville - Building 112 Chiller Addition
Results
$280,000 to $330,000 est. value
Greenville, SC 29607

Mills/Jarrett - Replace 2 Rooftop Units
Alteration
Post-Bid
$300,000 to $480,000 est. value
Columbia, SC 29201

Air Purification Units
Results
Kingstree, SC

Roof Mounting Exhaust Fans
Alteration
Post-Bid
Spartanburg, SC 29306

Aiken Replace Roof Top Units at Student Activity Center
Results
$215,000 to $225,000 est. value
Aiken, SC 29801

Water Cooled HVAC Chiller - Bon Secours Wellness Arena
Term Contract
Post-Bid
Greenville, SC 29601

Calhoun Building - Replace Air Handlers On 5Th Floor
Results
$325,000 to $350,000 est. value
Columbia, SC

Heat Pump System 7.5 ton Charleston SC
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Charleston, SC 29412

Last Updated 11/23/2022 11:15 PM
Project Title

SandMU; Tyger River CI - Replace Upper and Lower Yard Kitchen Boilers

Physical Address View project details and contacts
City, State (County) Enoree, SC 29335   (Spartanburg County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $95,824 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace existing steam kettles with new electric kettles. Kettles are to be owner furnished; contractor installed. Scope of work includes removal of the existing electric steam boiler, piping, and appurtenances. CONSTRUCTION COST RANGE: $ 75,000 to $ 90,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents