Similar Projects
Water System Improvements CDBG 2020
Infrastructure
Bidding
Cruger, MS

Valley Park Water Association, Inc
Infrastructure
Bidding
Valley Park, MS

New 400 GPM Water Well
Post-Bid
Foxworth, MS

Contract A Dorothy Street and Depot Street Waterline Replacement and Contract B Industrial Park Well Repairs
Infrastructure
Post-Bid
Charleston, MS 38921

2019 CDBG Glen Well
Results
Corinth, MS

Provide and Install 2 Pumps and Motors
Results
Mississippi City, MS 39762

Grinder Pump Systems Commodity FY22
Infrastructure
Post-Bid
Brandon, MS

2019 Alcorn County CDBG Biggersville Well
Results
MS

Contract "B" Water Well Improvements
Infrastructure
Post-Bid
Charleston, MS

Contract 2 Water Well - Drinking Water System Improvements
Renovation
Results
$885,000 est. value
Lucedale, MS

750 GPM Water Well and Appurtenances
Infrastructure
Post-Bid
Raleigh, MS

Test Holes and Test Wells mTrade Park
Infrastructure
Results
$264,000 est. value
Oxford, MS 38655

Drilling and Constructing a Gravel Wall Water Well
Infrastructure
Post-Bid
Roxie, MS

Drain Maintenance Services, G.V. "Sonny" Montgomery VA Medical Center, Facilities Management Service Jackson, MS 39216
Term Contract
Results
Jackson, MS 39216

12" Hydraulic Storm Water Pumping System
Infrastructure
Post-Bid
Starkville, MS

Reported 01/24/2022 12:40 PM
Project Title

Mega Site Water Supply Well

Physical Address View project details and contacts
City, State (County) Canton, MS   (Madison County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,131,523
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 40 - Process Integration.
Division 43 - Process Gas and Liquid Handling, Purification, and Storage Equipment.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents