Similar Projects
Corbett (Boardwalk Phase II)
Infrastructure
Bidding
$900,000 est. value
West Palm Beach, FL 33412

ADA Retrofits - Districtwide ADA Retrofits
Infrastructure
Bidding
$200,000 est. value

Phase I of Replacement and Installation of Sidewalks
Post-Bid
Pahokee, FL

Asphalt Sidewalk and Driveway
Post-Bid
West Palm Beach, FL

Asset Maintenance Services State Road 9 (I-95) Corridor throughout Palm Beach County
Term Contract
Results
Less than $40,606,300 est. value
FL

Commons Parking Lot Expansion
Results
Less than $520,000 est. value
Royal Palm Beach, FL 33411

Amazon Delivery Station - DFH6
Build-Out, Infrastructure - 120,282 SF
Construction
Riviera Beach, FL 33404

Gateway Boulevard and Military Trail Intersection Improvements
Post-Bid
$1,360,000 est. value
West Palm Beach, FL 33472

Mid-Western Service Center-Parking Lot Repair and Restriping
Term Contract
Results
Less than $100,000 est. value
Royal Palm Beach, FL 33411

Installation of an ADA Compliant Aluminum Railing and Retention Wall at the North Access of Lantana Beach
Infrastructure
Post-Bid
$120,000 est. value
Lantana, FL

Greenacres Sidewalk Project
Results
Greenacres, FL 33463

Safety D/B Push Button for WWD Devices at Interstate Ramps
Results

Annual Small Concrete and Pathway Construction Contract
Term Contract
Results
Less than $1,350,000 est. value
FL

Contract to Replace the Nature Preserve Walking Trail and Repair Retaining Wall
Results
Less than $144,494 est. value
Lantana, FL 33462

Big Blue Trace Multiuse Trail Project
Results
Less than $801,000 est. value
Wellington, FL 33414

Reported 03/22/2022 12:02 AM
Project Title

Westgate Avenue from Wabasso Drive to Congress Avenue Federalized Palm Beach County

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33409   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value $5,275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reduce Westgate Avenue from Five (5) lanes to Three (3) lanes, provide bike lanes and 6 feet sidewalks and 10 feet of flex use area for parking or landscaping from Wabasso Drive to Congress Avenue.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents