Similar Projects
Oakland WWTP Sludge Thickening - 291091.00 0 - City of Topeka
Renovation
Conception
$3,598,000 est. value
Topeka, KS 66612

East Filters Rehabilitation Phase II - 281102.01 - City of Topeka
Renovation
Conception
$5,185,000 CJ est. value
Topeka, KS 66612

Insulated Basin Covers for Clinton Plant
Renovation
Bidding
$50,000 CJ est. value
Lawrence, KS 66047

Replacement Pumps for Return Activated Sludge (RAS)
Renovation
Bidding
$30,000 CJ est. value
Topeka, KS 66616

On Call Contractor Services for Treatment Plant
Term Contract
Post-Bid
Wichita, KS

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

City of Wichita Northwest Water Facility (NWWF)
Addition
Construction
$20,000,000 CJ est. value
Wichita, KS 67203

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

Turkey Creek WWTF Miscellaneous Improvements
Renovation
Results
Mission, KS 66202

SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

2022 Wastewater Treatment Facility Improvements
Renovation
Results
$2,601,500 est. value
Osawatomie, KS 66064

Wastewater Treatment Plant SCADA Controls & Instrumentation Maintenance NBAF
Renovation
Post-Bid
Manhattan, KS 66506

Last Updated 09/07/2022 01:33 PM
Project Title

Lime Feed Building and Basin Modifications at Water Treatment Plant No. 2 / Olathe

Physical Address View project details and contacts
City, State (County) Olathe, KS 66051   (Johnson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Construction start expected December 2018
Bids Due View project details and contacts
Estimated Value $11,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 12, 2018, this project is designer and contractor are identified. Construction is scheduled to begin December 1, 2018. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. The following is for historical purposes: The short-listed contractors were: -Crossland Heavy Contractors -Garney Construction -MWH Contractors/Foley Construction (Joint Venture) The City of Olathe, Kansas Public Works Department seeks qualifications from highly qualified construction management firms for comprehensive Construction Management at Risk (CMAR) preconstruction and construction phase services for improvements at Water Treatment Plant No. 2 (WTP2) in Olathe, Kansas. This project includes replacement of the existing lime feed system in a new building, basin and clearwell rehabilitation, and construction of a chlorine dioxide disinfection system including a building to house chemical feed equipment and a new disinfection basin. ------ The Water Treatment Plant 2 currently has a total filtration capacity of 32.4 MGD. The plant has a total of 4 basins with a combined capacity of 38 MGD. Raw feed water is split between four basins, three softening and one coagulation basin, where it receives single-stage treatment before it is split between the convention filters and the membranes. The lime system was installed in 1998 and then expanded in 2005. The existing system consists of three lime silos and one soda ash silo. The original lime silos were retro-fitted with RDP Tekkem lime shaking equipment in 2005. Lime silo 1 is conveyed from the silo cone in the upper level by screw conveyor to the slaker in the upper level of silo 2. Silo 3 has its own slaking system. This is a pressurized system to prevent the slurry from caking. The soda ash silo was constructed in 2005. This silo was used very shortly and abandoned with soda ash still in the silo. Basin 1 is original to the plant and all equipment is from 1964. Basin 2, 3 and 4 were constructed with later expansions to the facility. All of the basins have various issues that shall be addressed with this project. This project will address all items necessary for the rehabilitation, construction and operation of the completed project. Work will include a lime building for housing of all equipment, all necessary mechanical, electrical, instrumentation and control layout, primary clarifying improvements, demolition plans and phasing, basin improvements, and selection of equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents