Similar Projects
HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

City Hall HVAC Monitoring
Alteration
Post-Bid
$28,840 est. value
Sammamish, WA 98075

Master Contract for HVAC Service - Statewide Opportunities
Term Contract
Post-Bid

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

Haller Elementary HVAC Upgrades
Alteration
Post-Bid
Bellevue, WA 98008

Gatewood ES Exterior Door and HVAC Upgrades
Alteration
Post-Bid
$2,100,000 to $2,400,000 est. value
Seattle, WA 98136

OMFC LCC HVAC Replacement
Alteration
Results
$2,647,102 est. value
Seattle, WA 98134

Sea ATCT Base Building Boiler Flue Replacement
Term Contract
Post-Bid
$30,000 to $45,000 est. value
Seatac, WA 98158

Capital Hill Roof and HVAC Replacement
Alteration
Post-Bid
$875,000 to $1,007,500 est. value
Seattle, WA 98102

Architecture Hall HVAC Improvements
Alteration
Results
$885,000 est. value
Seattle, WA 98195

HVAC Job Order Contracts Citywide
Alteration
Bidding
Renton, WA 98059

Civic Campus HVAC System Upgrade Project
Alteration
Post-Bid
$80,000 est. value
Pacific, WA 98047

128Th St Booster Station And Generator
New Construction, Infrastructure, Alteration
Post-Bid
$1,945,000 to $2,145,000 est. value

Mini Split Heating and Cooling Ductless HVAC Systems Installation
Term Contract
Bidding
Less than $25,000 est. value
North Bend, WA 98045

Last Updated 05/11/2022 01:02 AM
Project Title

Air Terminal Units (VAV Boxes) Replacement Project

Physical Address View project details and contacts
City, State (County) Auburn, WA 98092   (King County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Air Terminal Units (VAV Boxes) Replacement Project: - Replace air terminal units ("VAV boxes") in the Operations Support Wing (OSW) including connections to existing HVAC ducts and hydronic piping. - Replace hot water flow control valves. - Reinstall existing air terminal unit controllers and reconnect to existing BACnet compliant building automation system. - Provide testing, adjusting, and balancing for VAV systems.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents