Similar Projects
Renfrew Bridge
New Construction, Demolition, Infrastructure, Alteration
Conception
$2,303,000 est. value
Renfrew, PA 16053

Renfrew Bridge
New Construction, Demolition, Infrastructure, Alteration
Conception
$2,303,000 est. value
Renfrew, PA 16053

PA 68 Corridor Improvements
Alteration
Design
$13,184,467 est. value
Butler, PA 16003

SR 3031 Lions Road Bridge
Renovation, Infrastructure
Design
$250,000 est. value
Butler, PA 16001

Single Asphalt Seal Coat
Infrastructure
Bidding
$50,000 est. value
Butler, PA

Milling of Asphalt 496 Ton Asphalt Wearing Course
Infrastructure
Bidding
Evans City, PA

Civil and Paving Multiple Award Construction Contract
Term Contract
Sub-Bidding
$500,000 CJ est. value
Jacksonville, NC 28547

Double Asphalt Seal Coat
Post-Bid
Zelienople, PA

Asphalt Wearing Course
Post-Bid
Zelienople, PA

SR 68 Evans City East Resurfacing
Results
$2,500,000 to $4,999,999 est. value
Evans City, PA 16033

Harrisville Road Paving Project
Results
West Sunbury, PA 16061

Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Three Degree Road Intersection
Infrastructure, Alteration
Design
$48,928,145 est. value
PA

Single Asphalt Seal Coat
Post-Bid
Saxonburg, PA

181,403 SY Single Asphalt Seal Coat
Results
Sarver, PA 16055

Last Updated 07/25/2022 04:05 PM
Project Title

West New Castle St Phase 3 - Borough of Zelienople

Physical Address View project details and contacts
City, State (County) Zelienople, PA 16063   (Butler County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project calls for placing utility lines underground, replacing streetlights and light poles, and updating curbs. As of July 25, 2022, an engineer has been selected. Bidding is anticipated to take place in the fall of 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents