Similar Projects
Last Updated | 07/06/2023 08:37 AM |
Project Title | Tigard Street (Fanno Creek) Bridge Replacement - City of Tigard |
Physical Address | View project details and contacts |
City, State (County) | Tigard, OR 97223 (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Design Development, Construction start expected September 2024 |
Bids Due | View project details and contacts |
Estimated Value | $3,050,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project will replace the existing bridge with a new bridge wide enough to accommodate pedestrians and cyclists (on both sides) along with vehicles. Environmental regulations will require a new bridge to be significantly higher and longer than the current bridge, which may necessitate some rework of the existing Fanno Creek Trail just west of the bridge. The creek greenway will be excavated to construct a large floodplain detention pond to mitigate the bridge project; the pond will store water during storms. As of July 6, 2023 a design team has been selected. Design commenced in Fall 2022. Construction is expected to occur in summer to fall 2024, possibly 2025. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |