Similar Projects
Rose Creek Subdivision
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Fruita, CO 81521

River Trail Expansion - City of Grand Junction
Infrastructure
Conception
$1,700,000 CJ est. value
Grand Junction, CO 81501

Cimarron Estate Subdivision Home Builder Lots Available
New Construction
Design
$40,000,000 est. value
Grand Junction, CO 81501

F 1/2 Parkway Market to Patterson - City of Grand Junction
Infrastructure
Design
$9,000,000 CJ est. value
Grand Junction, CO 81505

GJ AE Renovate Urgent Care Building 1
Addition, Demolition, Renovation, Infrastructure
Bidding
$10,000,000 CJ est. value
Grand Junction, CO 81501

Purdy Mesa Flowline Pressure Control Tank
Infrastructure
Bidding
$200,000 CJ est. value
Grand Junction, CO 81501

CMU Wingate North Campus Housing - Masonry Rebid
New Construction, Infrastructure
Sub-Bidding
$17,000,000 CJ est. value
Grand Junction, CO 81501

CMU Wingate North Campus Housing - Masonry Rebid
New Construction, Infrastructure
Sub-Bidding
$17,000,000 CJ est. value
Grand Junction, CO 81501

Performing Arts Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$43,000,000 CJ est. value
Grand Junction, CO 81501

Performing Arts Expansion and Renovation
Demolition, New Construction, Infrastructure - 54,000 SF
Post-Bid
$43,000,000 CJ est. value
Grand Junction, CO 81501

Vacant Property Redevelopment 230 South 5th Street
Infrastructure
Results
Grand Junction, CO 81501

Roadway Reconstruction
Infrastructure
Results
$16,532,414 CJ est. value
Grand Junction, CO 81507

Riverfront At Dos Rios
New Construction - 45,000 SF
Construction
$40,000,000 est. value
Grand Junction, CO 81501

The Junction Apartments / Old City Market Redevelopment
Demolition, New Construction, Infrastructure - 200,980 SF
Construction
$60,000,000 CJ est. value
Grand Junction, CO 81501

The Magnus Court Subdivision
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Grand Junction, CO 81507

Last Updated 03/03/2023 11:34 AM
Project Title

Copper Creek Apartment Community

Physical Address View project details and contacts
City, State (County) Fruita, CO 81521   (Mesa County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of but is not limited to site work and construction of a new apartment community. Specific scope of work has not been announced. As of March 2, 2023, the project is in design phase. The developer will act as general contractor. Information regarding subcontract opportunities has not been announced. Construction is anticipated to begin second or third quarter 2023.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents