Similar Projects
New Transit Center Construction
New Construction - 3,000 SF
Conception
$40,000,000 est. value
San Rafael, CA

Next Generation Transit Maintenance, Operations, and Administration Facility
New Construction
Conception
$42,500,000 est. value
Linda, CA 95901

Mountain View Transit Center Grade Separation & Access
Renovation
Design
Mountain View, CA

Coastal Bluff Track Bed Stabilization And Seismic Improvements / Del Mar Bluffs Stabilization Phase 5 - San Diego Association Of Governments
Renovation
Design
$11,570,250 est. value
San Diego, CA 92101

Inspection Booth Removal and Install Mountain Pass Border Protection Station
Renovation
Bidding
$200,000 est. value
Nipton, CA 92364

Citywide Bike Racks And Sartc Bicycle Center Rebid
New Construction, Infrastructure
Bidding
$634,000 CJ est. value
Santa Ana, CA 92701

Janitorial Services (SDTC and SDTI)
Term Contract
Sub-Bidding
$100,000 CJ est. value
San Diego, CA 92101

North Base Charger Replacement Project
Renovation
Sub-Bidding
$20,000 CJ est. value
South San Francisco, CA 94080

PCPA Stagecraft Building Project
New Construction, Addition - 7,789 SF
Post-Bid
$5,732,852 est. value

PCPA Stagecraft Building Project
New Construction, Addition - 7,789 SF
Post-Bid
$5,732,852 est. value

Painting of Interior Vehicle Shop
Alteration
Results
Long Beach, CA 90806

Bus Hydrogen Refueling Station Consulting And Project Management Services
Renovation
Results
Santa Clarita, CA 91355

Bus Maintenance Facility Sheehy Court
New Construction
Construction
$25,000,000 est. value
Napa, CA 94558

2100 Mission Street
New Construction, Demolition - 28,700 SF
Construction
$2,000,000 est. value
San Francisco, CA 94110

Oakland International Airport Major Expansion and Modernization
New Construction, Renovation
Pending Verification
Oakland, CA 94621

Last Updated 08/03/2022 01:05 PM
Project Title

Bus Stop Improvements - 66619C - City of Azusa

Physical Address View project details and contacts
City, State (County) Azusa, CA 91702   (Los Angeles County)
Category(s) Transportation
Sub-Category(s) Misc. Structures
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $840,545 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation and/or replacement of bus stop amenities including shelters, benches, and trash receptacles. Project is included in the City of Azusa's FY 2022-2023 CIP. As of August 3, 2022, information regarding a design team and a general contractor is not available. At this time, it is not known if this project is still on hold. A timeline for funding and construction has not been determined. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents