Similar Projects
Two Apartment Buildings
New Construction
Conception
Sioux Falls, SD 57106

Two Apartment Buildings
New Construction
Conception
Sioux Falls, SD 57106

Moonlight Apartment Complex
New Construction
Design
Rapid City, SD 57703

Miller Ranch Subdivision
New Construction - 22,450 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Spearfish, SD 57783

Wolf Creek School Teacher Housing Bid Opening #1 - Site Infrastructure
New Construction
Post-Bid
Pine Ridge, SD

Pathways Shelter for the Homeless
Renovation
Post-Bid
Yankton, SD 57078

The Westview Heights Apartment Complex
New Construction
Construction
Sioux Falls, SD 57100

Prescott Place Apartments
New Construction - 57,581 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Sioux Falls, SD 57104

Slate at Harvest Creek Apartment Complex
New Construction
Pending Verification
$17,458,742 est. value
Sioux Falls, SD 57108

Slate at Harvest Creek Apartment Complex
New Construction
Pending Verification
$17,458,742 est. value
Sioux Falls, SD 57108

Citizens Building
Renovation
Conception
Aberdeen, SD 57401

Red Rock Shadows Townhomes and Apartments
New Construction
Design
$14,000,000 est. value
Rapid City, SD

Heartland Heights Apartments
New Construction
Construction
Rapid City, SD 57703

Two-Story Apartment Building In Sioux Falls
New Construction - 5,297 SF
Pending Verification
$1,121,904 est. value
Sioux Falls, SD 57110

The Brixx Apartments Phase I
New Construction, Infrastructure
Conception
$14,500,000 est. value
Sioux Falls, SD 57107

Last Updated 08/16/2022 10:09 AM
Project Title

Pelican Lakes Apartments & Marina

Physical Address View project details and contacts
City, State (County) Watertown, SD 57201   (Codington County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Bids by Invitation
Project Status Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 16, 2022 this project project is seeking site plan approvals. No architect has been disclosed. No general contractor has been disclosed. An actual construction start date has not been disclosed. Construction is expected to start by August 2023.

Details

1,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Heavy Timber Construction, Heavy Timber Pier Construction, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances and Storefronts, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers.
Division 11 - Equipment, Refrigerated Display Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Security Access Detection.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents