Similar Projects
Angel Mounds Interpretive Center Renovation
Build-out, Renovation - 16,675 SF
Bidding
$1,000,000 CJ est. value
Evansville, IN 47715

Crystal Beach Swimming Pool Replacement (GC Package)
Renovation
Bidding
$200,000 CJ est. value
Madison, IN 47250

IN076 ICTC Room 025 - CRAC Unit Replacement
Renovation
Sub-Bidding
$103,000 CJ est. value
Indianapolis, IN 46202

Hilltop Apartments RA3 Stairwell Concrete Repair 2022
Renovation
Sub-Bidding
$500,000 CJ est. value
West Lafayette, IN 47906

Concrete and Materials
Post-Bid
Logansport, IN

2021 Amberleigh Village Concrete
Infrastructure, Alteration
Post-Bid
West Lafayette, IN 47906

Concrete Street Repairs in Brookview Heights
Results
Evansville, IN

Concrete Street Repairs
Infrastructure
Results
Evansville, IN

Steel Work and Concrete Packages - Fall Creek Jr. HS Renovations
Alteration
Post-Bid
Fishers, IN 46037

State Road 1 Pedestrian Crossings
Infrastructure
Results
Bluffton, IN

Concrete Work
Alteration
Post-Bid
Reynolds, IN

Brandonwood Concrete Street Repairs
Infrastructure, Alteration
Results
Fort Wayne, IN

Concrete Cut Repair Services
Term Contract, Alteration
Post-Bid
Fort Wayne, IN

White Oak Concrete Street Repairs
Infrastructure, Alteration
Results
IN 46895

2022 Concrete and Flowable Fill Materials
Term Contract
Post-Bid
Jasper, IN

Last Updated 12/07/2022 07:53 PM
Project Title

Hampton Hall Room 4166 Renovation - 2022

Physical Address View project details and contacts
City, State (County) West Lafayette, IN 47907   (Tippecanoe County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project is the renovatin of an existing lab space and includes selective demolition, casework, finishes, new rooftop exhaust, new electrical and plubming distribution to accommodate new laboratory layout. B. Contract: Construction work under unified fixed price contract. The contractor will create a construction schedule of the Critical Path Method (CPM) type to monitor the project. The contractor will be responsible for providing all information concerning the sequencing and durations of all activities as well as providing the initial CPM logic diagram. Once the initial logic diagram is accepted by Purdue University, the contractor will be responsible for maintaining and providing periodic updates. B. If the scope is on multiple levels of a building, each level will be broken out. The electrical, mechanical and general scope will be detailed separately. C. This schedule shall be the Contractor's working schedule and used to plan, organize and execute the work, record and report actual performance and progress and outlines how the Contractor plans to complete all remaining work.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents