Similar Projects
Globeville Branch Library Construction
New Construction
Conception
$12,000,000 est. value
Denver, CO 80238

Hampden Branch Library Expansion - 2021 Bond - City of Denver
Addition, Demolition, Renovation, Infrastructure
Conception
$3,440,000 CJ est. value
Denver, CO 80231

Fairfield Inn & Towneplace Suites by Marriott / Denver
New Construction, Infrastructure
Design
$25,100,000 CJ est. value
Denver, CO 80204

Five Points Condominiums
New Construction, Infrastructure - 174,500 SF
Design
$65,000,000 CJ est. value
Denver, CO 80205

I-70 Floyd Hill to Veterans Memorial Tunnels
Renovation, Infrastructure
Post-Bid
$700,000,000 CJ est. value
Denver, CO 80216

Sun Valley Infrastructure
Infrastructure
Post-Bid
CO

Blair Caldwell Branch Library Renovation
Renovation
Results
$1,800,000 to $2,200,000 est. value
Denver, CO 80205

Tennessee and Oneida Storm System, Phase 1
Infrastructure
Results
$7,085,529 CJ est. value
Denver, CO 80202

Block 176
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

Edera Apartments - Phase I / Monaco and Evans
New Construction, Infrastructure
Construction
$113,000,000 CJ est. value
Denver, CO 80224

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

Return to Form / Mixed-Use
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Denver, CO 80216

Westwood Branch Library Construction
New Construction
Conception
$13,880,000 est. value
Denver, CO 80238

New Swimbeach Building
New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Denver, CO 80202

West Zoo Regional Stormwater Facility And Water Quality Rain Garden
Alteration
Post-Bid
Denver, CO 80205

Last Updated 03/28/2023 04:55 PM
Project Title

Globeville Branch Library Construction - 2021 Bond - City of Denver

Physical Address View project details and contacts
City, State (County) Denver, CO 80202   (Denver County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Library - Public, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected October 2024
Bids Due View project details and contacts
Estimated Value $12,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Created with input from the Globeville neighborhood and adopted In 2015, the Globeville Neighborhood Plan identifies a need for library service in the Globeville neighborhood. A 2017 Facilities Master Plan developed by Denver Public Library further identified Globeville as a neighborhood needing library service. This project will design and build an accessible, modern facility in Globeville. The new library will be a vibrant, active, educational and cultural community center offering valuable resources and services for the neighborhood. As of March 28, 2023, this project is included in the planning phase. A design firm has not been selected. It is anticipated design will start 3rd quarter 2023, construction start 4th quarter 2024, and completed 4th quarter 2026.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Roof and Deck Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Library Equipment, Library Stack Systems, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Furniture, Institutional Furniture, Library Furniture, Book Shelves, Study Carrels, Index Card File Cabinets, Portable Audience Seating, Seat and Table Assemblies.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents