Similar Projects
Roofing Replacement
Alteration
Bidding
$300,000 est. value
Hodgenville, KY

FM Paint Shop 0055 Roof Replacement
Renovation, Alteration
Bidding
Murray, KY 42071

Roofing Repair and Maintenance
Post-Bid

Roofing Repair and Maintenance
Post-Bid

Art Museum Roof and Window Replacements
Results
Owensboro, KY

Arnold Tower Reroof
Results
Less than $150,000 est. value
Danville, KY 40422

Facilities Management Grounds Building 0129 Roof Replacement
Renovation, Alteration
Bidding
$700,000 est. value
Murray, KY 42071

Wightman Unit Reroof
Post-Bid
Owensboro, KY 42303

General Butler Lodge Complex East Roof Replacement - RE-ADVERTISEMENT OF RFB-66-21
Results
Less than $405,000 est. value
Carrollton, KY 41008

Roofing and Guttering Replacement Bellwood Apartments
Alteration
Bidding
$400,000 est. value
Elizabethtown, KY 42701

Pogue Library Roof Replacement
Post-Bid
Murray, KY

Board Office Roof Replacement
Results
Winchester, KY 40391

FM Paint Shop 0055 Roof Replacement
Alteration
Bidding
$200,000 est. value
Murray, KY

Industry and Technology Building Roof Restoration
Post-Bid
Murray, KY

Roof Replacement Phase II
Results
$349,335 est. value
Somerset, KY 42501

Last Updated 05/20/2022 07:33 AM
Project Title

Roof Upgrades

Physical Address View project details and contacts
City, State (County) Danville, KY 40422   (Boyle County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,265,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Thomas Hall - Roof Upgrade 1. Remove existing roof membrane system, skylight and curb down to existing roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation and cover board insulation. Provide crickets where indicated. Install new roof access ladders. Raise through wall flashings where indicated. Grow Hall - Roof Upgrade 2. Low Slope: Remove existing roof membrane system down to existing roof deck. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, tapered insulation where indicated and cover board insulation. Provide crickets where indicated. Install new coping caps, gutters, downspouts and roof access ladders. 3. Steep Slope: Remove existing shingle roof system down to existing roof deck. Install new pre-finished galvanized standing seam roof system. Install new gutters and downspouts. Kerr Hall - Roof Upgrade 4. Remove existing roof membrane system, skylight and curb down to existing roof deck. Infill skylight opening with new steel decking. Install 2-Ply SBS Modified Bituminous Membrane Roofing system over ridged layer insulation, tapered insulation where indicated and cover board insulation. Provide crickets where indicated. Raise concrete scupper openings where indicated. 5. Lighting & Drywall: Modify existing skylight wells for new GWB ceiling, painting and lighting system

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents