Similar Projects
Installation and Procurement of Boiler Feed Pumps For the Carrollton Water Plant - Boiler Room
Renovation
Design
$300,000 CJ est. value
New Orleans, LA 70118

HVAC Repairs - Gernon Brown Rec Center
Renovation
Design
$300,000 CJ est. value
New Orleans, LA 70124

Hot Water Boiler Replacement at Eleanor McMain Secondary School
Renovation
Sub-Bidding
$300,000 CJ est. value
New Orleans, LA 70125

Cooling Tower Repairs at Criminal District Court
Renovation
Sub-Bidding
$400,000 CJ est. value
New Orleans, LA 70119

Exterior Duct Work
Alteration
Post-Bid
New Orleans, LA

HVAC RTU Repairs
Renovation
Post-Bid
$19,115 CJ est. value
New Orleans, LA 70117

LEC AHU Equipment Installation (Phase 1)
Alteration
Results
New Orleans, LA

Audubon Aquarium Air Handler Unit Replacements 3.1, 3.10 and 3.13
Renovation
Results
$727,000 CJ est. value
New Orleans, LA 70130

Sanchez Center HVAC Repairs
Renovation
Post-Bid
$300,000 CJ est. value
New Orleans, LA 70117

Boiler Replacement at Guste High Rise
Renovation
Results
$341,000 CJ est. value
New Orleans, LA 70113

Install 30 ton A/C for the fourth bay in the Greenhouse
Renovation
Post-Bid
$250,000 CJ est. value
New Orleans, LA 70124

Furnish and Install Air Handler Replacement Kitchen 1
Renovation
Results
$469,900 CJ est. value
New Orleans, LA 70130

Air Duct Cleaning
Term Contract
Post-Bid
New Orleans, LA 70126

Condenser Fan Motors
Term Contract
Post-Bid
New Orleans, LA 70112

HVAC Preventive Maintenance Service HANO Administrative Buildings
Term Contract
Post-Bid
New Orleans, LA 70112

Last Updated 07/10/2023 06:32 AM
Project Title

60 Ton Chiller

Physical Address View project details and contacts
City, State (County) New Orleans, LA 70112   (Orleans County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $168,766 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

60 Ton Chiller Installation Dates are subject to changes via an addendum posted by the Bureau of Purchasing on the City's supplier portal. The requested SLDBE Contract Goal is 18.22%. The City of New Orleans strongly encourages minority-owned and women-owned businesses, socially and economically disadvantaged businesses and small businesses to respond to this solicitation, or to participate in subcontracting opportunities pursuant to this solicitation. Chiller Replacement Project: 1. Mechanical Installation i) Demolition and removal of the existing McQuay Chiller 60 Chiller (only one). Recover refrigerant from one (1) failed chiller 60 ton, disconnect electrical and chill water piping from one existing 60-ton chiller, Remove of existing piping between isolation valves and chillers. ii) Receive, Store, and Setting/Rigging of the new equipment. iii) Piping and Insulation of New Chilled water lines and bleed air from 60-ton chiller. iv) Supply and Return piping to be insulated to match existing chilled water lines. v) Contractor will remove rubbish and clean/pick up debris daily. vi) Work performed by Contractor or its subcontractors will comply with all applicable Federal, State, and local codes and standards. vii) 60 Ton Air-Cooled Chiller: CGAM060A2 with coated condenser coils. (1) Startup Included - Trane Service must start equipment for warranty to be honored. (2) 208 volt 3 phases. (3) Full factory refrigerant charge (HFC-410A). (4) Refrigerant isolation valves (discharge valve). (5) Factory installed flow switch - set point 60 cm/sec. (6) Grooved pipe connection. (7) Factory insulation 0.75". (8) Wide ambient (0 to 125F/-18 to 52C). (9) Microchannel Complete Coat Condenser Coil. (10) Across the line starter/direct on line. (11) Single point connection main line unit power-ancillary items require other power. (12) Enclosure type UL 1995 rated for outdoor applications with Default A short circuit rating. (13) Elastomeric isolators with water strainer factory installed. (14) Super quiet acoustical package standard. (15) Architectural louvered panels. (16) Five (5) year complete unit Parts, Labor and Refrigerant warranty 2. Electrical Installation i) Disconnect existing chillers. ii) Install new seal tight and wire rated for 300 amp. iii) Make terminations in new chillers and existing disconnects. iv) Supports and miscellaneous material.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents