Similar Projects
Modifying Signal and Lighting System and Minor Concrete
Infrastructure
Bidding
$1,720,000 est. value
CA

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Bidding

Traffic Signal Cabinet TS2 Type 1
Infrastructure
Post-Bid
Less than $250,000 est. value
Sacramento, CA

Traffic Signal & Street Lighting Equipment
Infrastructure, Alteration
Post-Bid
Long Beach, CA 90899

Real-Time Traffic Flow Monitoring
Infrastructure
Results
Less than $500,000 est. value
Stockton, CA

Update signals and install safety lights
Infrastructure
Results
$1,090,000 est. value
CA

General Engineering A License Construction San Francisco San Mateo Santa Clara and Alameda Counties
Term Contract, Alteration
Bidding
$5,000,000 est. value
San Francisco, CA

8th Street and Plaza Drive Traffic Signal Synchronization Project
Infrastructure
Post-Bid
$378,000 est. value
El Centro, CA 922432816

Install Countdown and Accessible Pedestrian Signals
Infrastructure
Results
$1,040,000 est. value

BLNC Offsite Improvements East Brundage Lane and Dr Martin Luther King Jr BLVD
Term Contract, Infrastructure, Alteration
Bidding
$198,000 est. value
Bakersfield, CA 93304

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

2020/2021 SB-1 Street Maintenance Improvements
Infrastructure
Results
$5,147,829 est. value
Riverside, CA 92519

Better Market Street - Phase 1
Infrastructure
Post-Bid
$24,000,000 est. value
San Francisco, CA 94158

Place HMA and Modify Signal and Lighting Systems
Infrastructure
Results
$5,600,000 est. value
CA

Asphalt Rubber Cape Seal and Traffic Calming Project
Infrastructure
Post-Bid
$500,000 est. value
Suisun City, CA 94585

Reported 02/12/2022 12:00 AM
Project Title

Advanced Traffic Management System with Adaptive Traffic Control System

Physical Address View project details and contacts
City, State (County) Santa Clara, CA 95056   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To upgrade or replace the City’s existing traffic management system. This project includes the provision of an Advanced Traffic Management System (ATMS) with Adaptive Traffic Control System (ATCS) to enhance management, monitoring, and control of the signalized intersections in the City of Santa Clara

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents