Similar Projects
3 Crossings Phase 2 - Building B - Office, Retail and Riverfront Plaza
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pittsburgh, PA 15222

3 Crossings Phase 2 - Buildings F1 & F2 - Office
New Construction - 200,000 SF
Conception
$10,000,000 CJ est. value
Pittsburgh, PA 15222

The Ross
New Construction - 233,000 SF
Design
$16,800,000 est. value
Pittsburgh, PA 15237

District Hall
New Construction - 225,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Pittsburgh, PA 15213

East Carson Street UPMC Facility
Renovation - 20,000 SF
Sub-Bidding
$175,000 est. value
Pittsburgh, PA 15203

Design Assist RFQ - Ostermayer Lab Building Renovation
Renovation - 21,739 SF
Post-Bid
PA

Cathedral of Learning Ground Floor Renovation - General Construction
Renovation
Post-Bid
$2,000,000 to $2,500,000 est. value
Pittsburgh, PA 15260

Upper Ohio Area Office Upgrades
Results
$25,000 to $100,000 est. value
Pittsburgh, PA 15225

Locks and Dams Branch Office Upgrades, Pittsburgh District
Renovation
Results
$25,000 to $100,000 est. value
Pittsburgh, PA 15225

Redevelopment of Strip District Produce Terminal
Renovation - 55,000 SF
Construction
$13,636,000 est. value
Pittsburgh, PA 15222

Findlay Industrial Park Warehouse
New Construction - 83,000 SF
Construction
$6,200,000 est. value
Imperial, PA 15026

William Flynn Highway Retail
Renovation - 20,000 SF
Pending Verification
Bakerstown, PA 15007

Diamond Ridge
New Construction - 500,000 SF
Conception
$130,000,000 est. value
Coraopolis, PA 15108

SouthSide Works - The Box Office
New Construction, Renovation - 77,000 SF
Design
$37,000,000 est. value
Pittsburgh, PA 15203

Sump Upgrade For Three Sites in NJ & PA
Renovation
Post-Bid

Last Updated 12/14/2020 12:39 PM
Project Title

Construction of Workforce Development & Training Center - General Construction

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15212   (Allegheny County)
Category(s) Commercial, Education
Sub-Category(s) College/University, Office
Contracting Method
Project Status Construction Commenced November 2020
Bids Due View project details and contacts
Estimated Value $30,000,000 to $40,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 College/University, 60,000 SF New Construction Building.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents