Similar Projects
Mountain Pine Overlay No. 2
Infrastructure
Bidding
$437,334 est. value
Mountain Pine, AR

Road Bores
Term Contract
Post-Bid
Hot Springs, AR

Phase 2 Thornton Ferry Road County Roadway Improvements
Infrastructure
Post-Bid
Hot Springs, AR

Paving Compost Facility and Two (2) Areas at the Ouachita Water Treatment Plant
Infrastructure
Results
Hot Springs, AR 71901

Statewide CLRS Improvements
Infrastructure
Results

High Performance Cold Mix
Infrastructure
Post-Bid

Road Maintenance Services
Term Contract
Results
Hot Springs, Russellville, AR 71902

Asphalt Surfacing Projects at the Bus Garage
Infrastructure
Post-Bid
$600,000 est. value
Pearcy, AR

Hot Springs Lakeshore DR. Overlay (S)
Infrastructure
Results
$400,000 est. value
Hot Springs, AR 71913

Higdon Ferry Road and Central Avenue Intersection Improvements
Infrastructure
Post-Bid
$500,000 est. value
Hot Springs, AR 71913

HWY. 70 - HWY. 5 (S)
Infrastructure
Results

Fountain Lake Overlay (S)
Infrastructure
Results
AR

Districts 2 and 6 Centerline Rumble Stripe IMPVTS
Infrastructure
Results

Polymer Resin for Polymer Overlay
Term Contract
Results

Complete Two Trail Bridges and a Multi-Use Trail
New Construction, Infrastructure
Results
$625,000 est. value
Hot Springs, AR 71901

Last Updated 06/16/2022 04:55 PM
Project Title

Kelton St. - Hwy. 270 (Overlay)

Physical Address View project details and contacts
City, State (County) AR   (Garland County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose Of This Project Is To Overlay Approximately 1.93 Miles Of County Roads 83 In Garland County. This Project Consists Of Trenching And Shoulder Preparation, Aggregate Base Course, Achm Binder And Surface Courses, Cold Milling Asphalt Pavement, Achm Patching Of Existing Roadway, Reflectorized Paint Pavement Marking, Maintenance Of Traffic, And Misc. Items. 215001 Trench.And Shoulder Prep. 103.00 Sta 303107 Aggr.Base Course(Class 7) 305.00 Ton 401011 Tack Coat 2,972.00 Gal 406161 m.a. In Achm Binder(1") 477.00 Ton 406402 a.b.(Pg64-22)Achm Binder(1") 20.00 Ton 407162 Ma In Achm Surface(1/2") 3,239.00 Ton 407432 Ab(Pg64-22)Achm Surf(1/2") 189.00 Ton 412001 Cold Milling Asphalt Pvmt. 667.00 Sqyd 415011 Achm Patch.Exist.Rdwy. 40.00 Ton 601001 Mobilization 1.00 l.s. 603001 Maintenance Of Traffic 1.00 l.s. 604003 Signs 208.00 Sqft 718101 Refl.Paint Pvmt.Mrk.Yl(4") 20,592.00 Lf 726001 Standard Sign 132.00 Sqft 729003 Channel Post Sign Support-c 26.00 Each

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents