Similar Projects
Sewer PVC Fittings
Infrastructure
Bidding
Brockton, MA 02301

On Call Service Calls, Drain Cleaning
Term Contract
Post-Bid
$150,000 est. value
Brockton, MA

Sewer Ejector Conversion
Infrastructure
Post-Bid
Rockland, MA

Manhole Rehabilitation Project Phase 2
Results
$220,713 est. value
Abington, MA 02351

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Results
Less than $493,650 est. value

Sewer Force Main Replacement
Infrastructure
Post-Bid
$11,200,000 est. value
Whitman, MA

2021 Sewer System Rehabilitation
Results
$1,250,000 est. value
Brockton, MA

Construction for the Water Street Sewer Interceptor
Infrastructure
Post-Bid
$4,671,118 est. value
Plymouth, MA 02360

Court Street Sewer Main Replacement
Results
Plymouth, MA

Sewage Disposal System Components Upgrade, Parsons Lane 667-1 & 705-1
Infrastructure
Post-Bid
$318,820 est. value
Halifax, MA 02338

Point Allerton Avenue Sewer Repairs
Results
Hull, MA 02045

Water Street Sewer Interceptor Replacement
Term Contract
Post-Bid
$4,671,118 est. value
Plymouth, MA 02360

Point Allerton Avenue Sewer Repairs
Results
$45,000 est. value
Hull, MA 02045

On-Call Emergency Repairs for Horizontal Utilities (Water, Sewer and Drain)
Infrastructure
Results
$150,000 est. value
Plymouth, MA

FY 22 Catch Basin Cleaning Services
Term Contract
Results
Hanover, MA

Last Updated 06/14/2022 12:35 AM
Project Title

Abandonment of Existing Septic Tanks, FAST Tank and Blower System

Physical Address View project details and contacts
City, State (County) Halifax, MA   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $318,820 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Abandonment of Existing Septic Tanks, FAST Tank and Blower System, Removal of Existing Sewer Manholes, Installation of New Sewer Pipe and Sewer Manholes, Installation of New Septic Tank, Removal and Replacement of Existing Driveway, Parking Areas and Sidewalk, Clearing and Grubbing, Installation of New Electrical Cabinet

Details

Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents