Similar Projects
Apex Warehouse - Drainage Rehabilitation
Infrastructure
Bidding
Apex, NC 27502

W-5601DH 3rd and Dock Street
Infrastructure
Bidding
Wilmington, NC 28401

18" N-12 HDPE IB/WT Double Wall 20"
Post-Bid
Jacksonville, NC

WWTP Erosion Discharge Repair
Post-Bid
Clinton, NC

Erosion and Sediment Control and Rough Grading for a new Ashe County Middle School
Results
NC

USDA FS NFsNC Tusquitee RD Shuler Creek Stream Restoration Project
Results
$25,000 to $100,000 est. value
Murphy, NC 28906

Carriage Park Entrance Culvert Rehabilitation
Construction
Hendersonville, NC 28791

Eden Village Infrastructure
Infrastructure
Bidding
Wilmington, NC

Replace Grounds in the 1-7 ADA BN Motor pool X4622, Fort Bragg, NC
Post-Bid
Fayetteville, NC 28307

UT Morgan Creek Stream Restoration Project
Results
Carrboro, NC 27510

Old Concord Road Park and Ride Facility Pond and Slope Repairs
Infrastructure
Bidding
$325,000 to $375,000 est. value
Charlotte, NC 28213

Pond Breach and French Drain Package of the E-51 Woods Creek Elementary School Project
Post-Bid
Cary, NC

Carteret Community College - Shoreline Stabilization Project
Results
Morehead City, NC 28557

Corrugated Aluminized Pipe
Infrastructure
Bidding
Newton, NC 28658

Pathways Elementary School Exterior Drainage
Post-Bid
Hillsborough, NC 27278

Reported 10/13/2021 10:03 AM
Project Title

Richard E Whitted Complex Stormwater Improvements

Physical Address View project details and contacts
City, State (County) Hillsborough, NC 27278   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Improvements include storm drainage network to collect roof drainage and rear yard drainage, foundation waterproofing along several buildings, landscaping enhancements, safety railing replacement, stone stair repair, new ADA ramp and retaining walls, dumpster corral, parking lot upgrades, building repointing at Recreation building.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents