Similar Projects
Roadway Minor Rehab
Infrastructure
Design
$1,132,004 CJ est. value
Lima, OH 45801

Roadway Minor Rehab - SR 66
Infrastructure
Design
$1,501,226 CJ est. value
Delphos, OH 45833

Lima City Schools Career Tech Facilities
New Construction, Infrastructure
Bidding
$3,695,000 CJ est. value
Lima, OH 45801

Heritage Elementary - ADA Playground
Infrastructure
Bidding
$146,000 CJ est. value
Lima, OH 45805

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Lawn and Jackson Water Main Replacement
Infrastructure
Post-Bid
$398,282 est. value
Bluffton, OH

Water Valve Replacement
Infrastructure
Results
$466,820 est. value
Delphos, OH

North Sugar Street Waterline Repair
Infrastructure
Results
$2,000,000 est. value
Lima, OH 45806

Lima Community Aquatic Center
New Construction, Infrastructure
Pending Verification
$8,900,000 CJ est. value
Lima, OH 45801

Lakeview Farm Expansion
Addition, Demolition, Infrastructure - 180,000 SF
Pending Verification
$27,000,000 CJ est. value
Delphos, OH 45833

Roadway Minor Rehab - SR 696
Infrastructure
Design
$1,694,996 CJ est. value
Bluffton, OH 45817

County Contract Tar & Chip Program -23
Infrastructure
Bidding
$161,262 CJ est. value
Lima, OH 45801

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

4th Street Outpost Cold Storage Building
New Construction, Infrastructure
Results
$378,000 CJ est. value
Lima, OH 45804

Roadway Minor Rehab - SR 116/117
Infrastructure
Design
$738,224 CJ est. value
Spencerville, OH 45887

Last Updated 05/10/2023 04:18 PM
Project Title

West High and North Jameson Sewer Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Lima, OH 45801   (Allen County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $5,864,911 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of May 10, 2023, this project has not yet been awarded. A timeline for award has not yet been established.** The project consists of rehabilitation of existing large diameter combined sewers where approximately 1,782 LF will be removed and replaced and 980 LF will be lined with geopolymer lining. Three existing manholes will also be removed and replaced, two will be refurbished. and one new manhole will be installed. This includes all required backfill, pavement planning, and resurfacing of the project area. The project also includes CCTV of the project sewers to be rehabilitated with geopolymer lining and bypass pumping. Details for mailing payment will be sent upon receipt of e-mail request. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Each bidder must be a registered plan holder with ms consultants, inc. to be eligible to submit a bid for this project. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, with additive alternate bid items as indicated in the Bid Form. The Engineer's Estimate for these improvements is $5,916,200. Purchasing Department is located on the 3rd floor of the Municipal Building, 50 Town Square. Outside of the envelope not being properly marked may result in bid not being received by the Purchasing Department before the deadline and could result in bid being disqualified. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all partiesrecorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division specification sections, apply to work of this section. All to be evaluated in base price. B. Abbreviated Written Summary: Briefly, and without force and effect upon contract documents, work of the base contract can be summarized as follows: 1. The work consists of the construction, testing, and construction approvals from the Owner. a. Open-cut replacement of the 54-inch diameter sewers that had the spiral-wound liner installed in 2018 (MH 14032 to MH 13250) b. Geopolymer lining of the remaining sewers. The work shall be in accordance with these specifications and in reasonable, close conformity with the line and grades shown on the plans or established by the Design Professional.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents