Similar Projects
Bikeways - HAM Deer Park Bike/Ped Connector
Bidding
Deer Park, OH

Sidewalk - HAM Cincinnati PSIP FY21
Bidding
Cincinnati, Norwood, OH

Sidewalk - HAM Mt. Healthy SRTS 2017
Post-Bid
Mount Healthy, OH

Wasson Way Phase 4+5
Post-Bid
OH

Asphalt Parking Lot With Concrete Curb, Concrete Walk, and a Concrete Pad
Results
Woodlawn, OH 45215

2019 Street Resurfacing, Curb Removal and Replacement Project
Results
Less than $281,182 est. value
Fairfax, OH 45227

New Parking Lot
Bidding
Cincinnati, OH 45238

2915 Clifton Avenue Parking Lots Modifications
Results
Less than $425,000 est. value
Cincinnati, OH 45221

Miscellaneous - HAM-US 127-09.67
Bidding
North College Hill, OH

Little Miami Scenic Trail Newtown Road to Walton Creek
Results
Less than $730,000 est. value
OH

Sidewalk Reconstruction Program
Results
Madeira, OH 45243

Sidewalk Project 2019
Results
Less than $231,579 est. value
OH 45140

Sunset Avenue Landslide Correction
Results
Cincinnati, OH 45202

Housing Repair Services - Accessibility Modifications
Term Contract
Results
Less than $50,000 est. value
Cincinnati, OH 45202

St Martins Place and Municipal Parking Lot Improvements
Results
Cheviot, OH

Last Updated 12/04/2020 11:17 AM
Project Title

Small Infrastructure Project

Physical Address View project details and contacts
City, State (County) Blue Ash, OH   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Alliance Road Sidewalk (5 FT wide) Following existing grade, construct a 655 LF sidewalk connecting the cul-de-sac at Alliance Road to the existing ADA ramp on Glendale-Milford Road. The concrete walk will be 5” thick with an aggregate base. The cost of the aggregate base to be incidental to the concrete walk cost. In addition to the concrete walk, a 12” ADS culvert pipe will be installed with ADS flared end sections and embankment sloped from top of pipe to edge of walk. The concrete walk will maintain a 6’ offset from back of curb, as needed, where it parallels the alignment of Reed Hartman Highway. The contractor shall coordinate with the City for exact location and layout. 2. Oakhurst Court Curb and Gutter Extension Install 360 LF of type 2 curb and gutter, starting at existing curb located on the east side of Oakhurst Court and continue along the south side of Cooper Road heading east to the driveway at 3533 Cooper Road. Contractor will pin the new curb to the existing using ½” dowels at a minimum of 18” in length.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents