Similar Projects
Chandler (1300 Block) Reconstruction - 107.24.02 - City of Danville
Infrastructure
Conception
$400,000 CJ est. value
Danville, IL 61832

Rebuild Downtown and Mainstreets Project - 107.24.03 - City of Danville
Infrastructure
Conception
$3,000,000 CJ est. value
Danville, IL 61832

Z1DA--Project 550-24-201 Replace Campus Sidewalk CON
Infrastructure
Bidding
$1,000,000 CJ est. value
Danville, IL 61834

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Bridge Repairs to SN 092-9903 and Removal of SN 092-9904 at Kickapoo State Park
Infrastructure
Results
$1,473,747 CJ est. value
Oakwood, IL 61858

2022 High School Bleachers and Press Box
Infrastructure
Results
$492,595 CJ est. value
Hoopeston, IL 60942

Concrete Pad with Downspout/ Drainage Tile Work
Infrastructure
Construction
$70,000 CJ est. value
Bismarck, IL 61814

Concrete Pad with Downspout/ Drainage Tile Work
Infrastructure
Construction
$70,000 CJ est. value
Bismarck, IL 61814

Poland Road Sewer Relocations - 402.24.04 - City of Danville
Infrastructure
Conception
$500,000 CJ est. value
Danville, IL 61834

Construct Parking Lot/Street Lighting GH Area at Illiana VA - Rebid
Infrastructure, Renovation
Post-Bid
$745,000 CJ est. value
Danville, IL 61832

Lakeside Drive, Eastgate Drive, and Woodland Trace Pump Station Improvements
Demolition, Infrastructure, Renovation
Results
$980,386 CJ est. value
Danville, IL 61832

5th Street Pump Station Elimination - 402.24.05 - City of Danville
Renovation, Infrastructure
Conception
$1,000,000 CJ est. value
Danville, IL 61832

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Standard Overlay, Cold Milling,Guardrail, Culvert Replacement, ADA Improvements
Infrastructure
Results
$6,915,403 CJ est. value
Danville, IL 61832

Last Updated 10/07/2023 05:09 PM
Project Title

Market Street Water Main Replacement

Physical Address View project details and contacts
City, State (County) Hoopeston, IL 60942   (Vermilion County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: Market Street from Honeywell Ave. to Penn St. in Hoopeston, IL Description: The Work of this Contract is generally described as the construction of 8-inch and 4-inch diameter potable water main from E. Penn St. to E. Honeywell Ave. on Market St. and from Front St. to Market St. on E. Honeywell Ave., including valves, fire hydrants, and other appurtenances. Work includes removal and replacement of existing curb and gutter, asphalt pavement, replacement of several public side water services and minor concrete sidewalk removal and replacement. Total project length is approximately 1,800 feet. Questions regarding the bid documents should be directed to Donohue & Associates attention: Alexis Sheehan, PE (Telephone 217-903-4438, email asheehan@donohue-associates.com)

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents