Similar Projects
Clinton Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$2,500,000 CJ est. value
Huntsville, AL 35801

Clinton Avenue Improvements - City Of Huntsville
Infrastructure
Conception
$2,500,000 CJ est. value
Huntsville, AL 35801

Oak Meadows
New Construction, Infrastructure
Design
Huntsville, AL 35810

Paxton Place Apartments
New Construction, Infrastructure
Design
$125,000,000 CJ est. value
Huntsville, AL 35801

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Transit Transfer Station
New Construction, Infrastructure
Post-Bid
$15,677,228 CJ est. value
Huntsville, AL 35801

Old Monrovia Site Prep
Infrastructure
Results
$450,000 est. value
Huntsville, AL

Middle School Roadway Extensions
Infrastructure
Results
$2,016,565 est. value
Madison, AL

Circle K - Road Improvements and Convenience Store
New Construction, Alteration - 5,533 SF
Construction
Huntsville, AL 35810

Livano Town Madison
New Construction, Infrastructure - 422,545 SF
Construction
$119,000,000 CJ est. value
Madison, AL 35758

Carillon Oaks Madison
Demolition, New Construction, Infrastructure - 35,195 SF
Pending Verification
$9,500,000 CJ est. value
Madison, AL 35758

Everstead Residential Development
New Construction, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Madison, AL 35758

Eastern Bypass - City Of Huntsville
Infrastructure
Conception
$10,600,000 CJ est. value
Huntsville, AL 35763

Margaritaville Hotel / Madison
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Madison, AL 35758

Kroger U-606 / Madison
Demolition, Infrastructure, Build-out, Renovation - 89,892 SF
Post-Bid
$2,500,000 CJ est. value
Madison, AL 35758

Last Updated 05/02/2023 11:07 AM
Project Title

Memorial Parkway Pedestrian Skybridge - City of Huntsville

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35810   (Madison County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a pedestrian bridge over Memorial parkway. A more detailed scope is expected to be released on a future date. As of May 1, 2023, this project is in the conceptual phase. An engineer has been selected for the project. Per the owner, a firm timeline for construction has not been established.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents