Similar Projects
Water Distribution Improvements
Infrastructure
Bidding
$700,000 CJ est. value
Elizabeth, MN 56533

Water System Improvement Valve Vault
Renovation, Infrastructure
Bidding
$1,300,000 CJ est. value
Winton, MN 55796

Pipe Lining
Term Contract
Sub-Bidding
Austin, MN 55912

CW - Residential Plumbing Services
Term Contract
Sub-Bidding
Minneapolis, MN 55415

Plumbing Services at all MCES Locations
Alteration
Post-Bid
Minneapolis, MN

Twin Cities Habitat for Humanity Plumbing
Alteration
Post-Bid
Saint Paul, MN 55106

Curling Facility Refrigeration System Replacement
Renovation, Alteration
Results
Duluth, MN 55802

Mechanical Pipefitting Services for all MCES Facilities
Alteration
Results
MN

Upgrades to South Passage Wastewater Treatment System
Infrastructure
Bidding
$400,000 CJ est. value
Credit River Township, MN 55372

Birch Lake ES Domestic Piping Replacement
Alteration
Post-Bid
White Bear Lake, MN 55110

Architectural/Engineering Services for Student Center & Library
Renovation, Infrastructure, Alteration - 8,995 SF
Results
$786,000 est. value
Saint Paul, MN 55106

Plumbing Services 2022
Alteration
Post-Bid
Saint Paul, MN

Goodview Avenue Water Main Extension
Infrastructure
Results
$2,270,208 CJ est. value
Cottage Grove, MN 55016

Public Safety Facility Shower Refurbishment
Alteration
Post-Bid
$50,000 est. value
Minneapolis, MN 55415

Palmer Creek Estates Stream Restoration
Infrastructure
Results
$558,098 CJ est. value
Plymouth, MN 55442

Last Updated 06/27/2023 08:39 AM
Project Title

Phase 2 Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Deer River, MN 56636   (Itasca County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,717,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Urban Street Reconstruction Concrete Walks Curb & Gutter Storm Utilities Water Utilities Sewer Utilities Turf Restoration Owner anticipates that the Project's total bid price will be approximately $2,700,000. The Project has an expected duration of 100 days. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and Construction Materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents