Similar Projects
San Rafael Creek Maintenance Dredging Project
Term Contract
Post-Bid
$4,000,000 to $8,000,000 est. value
CA

Richmond Inner Harbor Maintenance Dredging
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Richmond, CA 94801

West Coast Hopper Dredge Fy22
Term Contract
Design
$25,000,000 to $100,000,000 est. value
Ilwaco, WA

Ventura Harbor Maintenance Dredging
Term Contract
Results
$10,000,000 to $20,000,000 est. value
Ventura, CA 93001

Oceanside Harbor Maintenance Dredging
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Oceanside, CA 92054

Wharves 1- 4 Maintenance Dredging 2021 Project
Infrastructure
Results
$1,048,504 est. value
Redwood City, CA

Digester Cleaning Services
Term Contract, Alteration
Bidding
Modesto, CA

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Fy22 Navigation Market Research
Term Contract
Post-Bid

Reported 02/17/2022 12:00 AM
Project Title

Maintenance Dredging and Confined Aquatic Disposal (CAD) Facility Construction

Physical Address View project details and contacts
City, State (County) Newport Beach, CA   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction services will consist of dredging approximately 800,000 cubic yards of material and disposal of that material at the LA-3 Ocean Dredged Material Disposal Site; dredging approximately 282,000 cubic yards of material to a depth of -46’ in order to construct a confined aquatic disposal facility (CAD) and placement of material in the nearshore of Balboa Peninsula; dredging approximately 100,000 cubic yards of material that is unsuitable for ocean disposal and placement of that material inside the constructed CAD in lifts of uniform thickness verified by surveys; dredging approximately 7,000 cubic yards of additional material and disposal of that material in the nearshore of Balboa Peninsula; and removal of abandoned utility cables from within the Federal Channels where they conflict with the dredge footprint.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents