Similar Projects
Osakis Water Tower Improvements
Renovation, Infrastructure
Bidding
$550,000 CJ est. value
Osakis, MN 56360

2023 Street Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Miltona, MN 56354

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Woodland Dentistry / Alexandria
New Construction, Infrastructure - 10,518 SF
Post-Bid
$6,100,000 CJ est. value
Alexandria, MN 56308

Design Replace Building 22 Pipe RTC-Brainerd
Renovation, Infrastructure, Alteration
Results
Brainerd, MN

Knute Nelson Field Improvements
Infrastructure
Results
$396,800 CJ est. value
Alexandria, MN 56308

Lake Geneva Camper Housing
New Construction, Infrastructure, Renovation
Construction
$60,000 CJ est. value
Alexandria, MN 56308

Alomere Health Rehab Services - BP 1
New Construction, Infrastructure - 28,581 SF
Post-Bid
$3,500,000 CJ est. value
Alexandria, MN 56308

2023 TH29 Sidewalk Extension
Infrastructure
Results
$533,161 CJ est. value
Alexandria, MN 56308

Alexandria Clinic West Parking Lot
Infrastructure
Post-Bid
$250,000 CJ est. value
Alexandria, MN 56308

2023 Alexandria Local Street Improvements
Infrastructure
Results
$409,580 CJ est. value
Alexandria, MN 56308

Alexandria Apartments
New Construction, Infrastructure - 34,000 SF
Post-Bid
$9,000,000 CJ est. value
Alexandria, MN 56308

2023 Rosewood Lane Regional Stormwater Facility
Infrastructure
Results
$207,218 CJ est. value
Alexandria, MN 56308

dupeAlomere Health Rehab Services Bid Package 02
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Alexandria, MN 56308

Indian Lake PWA Parking Lot Graveling
Infrastructure
Results
$21,800 CJ est. value
Garfield, MN 56332

Last Updated 06/20/2023 06:35 PM
Project Title

ALP Latoka Lane Water Main Improvements

Physical Address View project details and contacts
City, State (County) Alexandria, MN 56308   (Douglas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $237,065 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall be completed under one Contract and consists of all labor, skill, and materials required to properly construct the Project. The Project generally consists of the following primary components: Contract No. 1 - General Construction: Installation of approximately 375 linear feet of 12-inch directionally drilled FPVC or HDPE pipe, installation of approximately 590 linear feet of 8-inch directionally drilled FPVC or HDPE pipe, install 8-inch gate valves, fire hydrants, and all associated Work. Each Bid shall be accompanied by a Bidder's Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of Minnesota, payable to the ALP Utilities, in a sum equal to five (5) percent of the full amount of the Bid. This is to serve as a guarantee that the Bidder will enter into a Contract within 15 days of Notice of Award in accordance with the terms of the principal's Bond and a contractor's Bond as required by law and the regulations and determinations of the governing board for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. Bidder must be licensed for the full amount of the Bid. No Bid will be read or considered which does not fully comply with the above provisions as to bond and license. Upon Owner's request, Bidders must certify they are a Responsible Contractor by signing a certification form stating they meet the minimum requirements under Minnesota Statute 16C.285. This form can be found in Section 00 43 29 of the project documents. No Bid will be read or considered unless it fully complies with the Bond and license requirements. Any deficient Bid will be resealed and returned to the Bidder. Bidder agrees to complete the Work to Substantial Completion by the calendar dates indicated below, and have all Work completed and ready for Final Payment, in accordance with paragraph 14.07.B of the General Conditions, by the below indicated calendar dates. Contract No. 1 - General Construction: a) Substantial Completion - November 1, 2023 b) Final Completion - November 17, 2023 All Bids will be made on the basis of cash payment for such Work. The Owner reserves the right to reject any or all Bids, waive any informalities in the Bids received, and further reserves the right to award the Contract in the best interest of the Owner. The Owner reserves the right to hold the three (3) lowest Bids for a period not to exceed 60 days after the date of Bid opening. The Work shall be substantially completed by November 1, 2023 and shall be completed and ready for final payment on or before November 17, 2023.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents