Similar Projects
Last Updated | 09/02/2022 07:32 PM |
Project Title | Roof Replacement And Restoration |
Physical Address | View project details and contacts |
City, State (County) | Sandoval, IL 62882 (Marion County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $135,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project description: BASE BID includes roof restoration (in-cluding limited sub-strate replacement), membrane re-roof and complete roof replace-ment at Sandoval High School. Project also includes roof restora-tion (including limited substrate replace-ment) at Sandoval Grade School. Gutter/ downspout replace-ment, snow retention system and limited parapet and metal cap repair work is includ-ed at Sandoval High School. Limited gutter work is included at Sandoval Grade School. Contractor will be responsible for order-ing equipment and all materials immediately after contract execu-tion and shop drawing approvals, regardless of the first day avail-able for construction. Contractor will be re-sponsible for storing and insuring equip-ment and materials until the first day available for construc-tion (approximately May 29, 2023). See Sec- tion 012000 for addi-tional information. Drawings and speci-fications will be avail- able for viewing on the internet at: www.hurst-rosche.com The documents are be-ing provided for refer-ence purposes only. Bidders are encour-aged to obtain a signed and sealed hard copy set of the bidding documents. At a minimum, bidders must obtain clean copies of bid forms from the offices of Hurst-Rosche, Inc. by paying a non-refund-able amount of $10.00 to submit a bid for this project. Should the Contractor fail to complete the Work within such time, con- tractor agrees to com-pensate and will apply to the Owner for each and every day of such delay in completion of the Work beyond the Contract Time the sum of Five Hundred Dol-lars ($500.00) per day for Work not complet-ed by the substantial completion date as liq-uidated damages. The Owner reserves the right to accept or reject any or all Bids or any part thereof, to waive any informality in bidding, and to ac-cept bids deemed most favorable to the Own-er. SANDOVAL C.U.S.D. NO. 501 MATT DANNAMAN, SUPERINTENDENT |
||||||||||||||||||||||||||||||||||||||||
Details | 12,945 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |