Similar Projects
10th Street Neighborhood
New Construction
Conception
Mountain Home, ID

North Star Outdoor Storage
New Construction - 217,808 SF
Conception
$500,000 est. value
Meridian, Star, ID 83669

Store Local- Phase 1 Areas A, B and C
Renovation - 125,292 SF
Design
$5,410,000 est. value
Boise, ID 83706

West Boise Water Renewal Facility (WBWRF) Maintenance Building - North Restroom Addition
Addition
Bidding
$300,000 est. value
Boise, ID 83714

The Everest Lot 1
Addition - 58,000 SF
Post-Bid
Boise, ID 83716

Fedex Distribution Center
New Construction - 180,000 SF
Post-Bid
$10,000,000 est. value
Jerome, ID

Storage Building
New Construction
Results
Idaho Falls, ID

Mackay Hatchery Pole Building
New Construction - 1,536 SF
Results
$200,000 est. value
Mackay, ID 83251

Amazon Delivery Station
New Construction - 140,000 SF
Construction
$10,000,000 CJ est. value
Meridian, ID

Public Storage - Ten Mile Road / Meridian
New Construction
Conception
$3,000,000 est. value
Meridian, ID 83646

Cemetery Project
New Construction
Post-Bid
$725,500 est. value
Blackfoot, ID 83221

Vehicle and Equipment Structures
New Construction - 11,800 SF
Results
$200,000 est. value
Caldwell, ID 83605

Krahn Lane Self-Storage / McCall
New Construction - 30,050 SF
Conception
$3,200,000 est. value
McCall, ID 83638

Saturn Way Storage Condos
New Construction - 1,495,284 SF
Post-Bid
$10,000,000 CJ est. value
Boise, ID 83709

Wittman Complex and MTB Renovations Phase 1 Lewis-Clark State College
New Construction, Demolition
Results
$295,000 est. value
Lewiston, ID 83501

Last Updated 07/13/2022 12:11 PM
Project Title

Falcon Storage Condos

Physical Address View project details and contacts
City, State (County) Boise, ID 83709   (Ada County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Bids by Invitation.
Project Status Construction Documents, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a warehouse / distribution facility in Boise, Idaho. Working plans call for the construction of a 129,968-square-foot, one-story above grade warehouse / distribution facility; and for site work for a warehouse / distribution facility. - https://idahobusinessreview.com/2022/07/08/biz-bite-falcon-storage-condos-mixed-use-project-coming-near-boise-costco/ Falcon One Inc. and partner Alpine Investment Group have announced a new mixed-use project coming to Boise at Saturn Way across from Costco. The partners have awarded construction to Wright Brothers Construction to build a 126,635-square-foot project with private, gated storage condos and store front space. Construction is planned to begin later this month, according ... ___________ Plans call for the construction of a new self-service storage facility with twelve buildings and associated site improvements. Building permits were issued for all 12 buildings by the City of Boise on July 8, 2022. An architect and general contractor have been selected. Construction is anticipated to begin in the third quarter of 2022.

Details

Warehouse/Storage, 1 Story Above Grade, 129,968 SF New Construction, 12 Buildings.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents