Similar Projects
Slate Rd
Infrastructure
Bidding
WV

Brickside Bar and Grill Drainage / Slip Repair
Infrastructure
Bidding
$250,000 est. value
Clarksburg, WV

Mountain Valley Elementary School Renovations
Renovation
Post-Bid
Bluefield, Princeton, WV 24701

Williamson (Hight) Drainage and Portals
Infrastructure
Post-Bid
Charleston, WV

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Pond Run Project
Infrastructure
Bidding
$1,165,084 est. value
Parkersburg, WV

Stormwater Pond 1 Diversion Project
Infrastructure
Post-Bid
Martinsburg, WV

Pike Island Monolith R33 and RR34 River Wall Crack Stabilization 2020
Results
$500,000 to $1,000,000 est. value
Wheeling, WV 26003

Meadow River Trail FEMA Remediation Project
New Construction, Infrastructure
Post-Bid
Lewisburg, WV

Babcock State Park - Sewell Trl
Results
WV

Summersville Battle Run Waterline
Infrastructure
Post-Bid
$100,000 to $250,000 est. value
Summersville, WV 26651

Enslow Boulevard Erosion Repair
Results
Huntington, WV

Installation of a 36" Drain
Infrastructure
Post-Bid
Danville, WV

Finger Dam Drain Trough
Results
Elkins, WV

Last Updated 04/20/2022 10:00 AM
Project Title

Fairmont-Marion County Regional Airport Authority - Drainage Improvements

Physical Address View project details and contacts
City, State (County) Fairmont, WV   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $50,000 to $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will remediate several drainage issues throughout the airport. In particular, there are four (4) main areas where stormwater is flowing uncontrolled at the Airport causing erosion. The first area is on the west side of the west GA Area. The fencing in this area is being undercut and the project will rectify this by adding in rip-rap to allow water to pass that point without eroding the bottom of the fence. The second and fourth areas are at the north end of the west T-Hangar Area, between the parallel Taxiway and the Hangar Apron area. There is stormwater concentrated into rills, or gullies, that are not stabilized to control erosion. A rip-rap channel will be installed in the drainage channels since those are small, well-defined areas. The areas around the rip-rap channels will be reseeded and mulched with erosion control mulch blanket. These areas are roughly 0.10 acres and 0.04 acres respectively. The third area is along the fill slope on the south side of Runway 23, extending from approximately the displaced threshold 600’ +/- to the south. In the third area, a berm will be installed at the top of the slope to force the runoff to areas where rip rap channels will be installed. A rip-rap channel will be installed in the drainage channel. The areas around the rip-rap channels will be reseeded and mulched with erosion control mulch blanket. This area is roughly 0.83 acres. The project area will also include an existing site that has been used as a staging area for previous project. The overall goal of the project is to eliminate the erosion by stabilizing the areas where the runoff is flowing.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents