Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station #6
New Construction
Conception
Mansfield, TX

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

Fire Station #43
New Construction
Design
$5,000,000 est. value
Fort Worth, TX

Leander Fire Station No. 2 Addition and Renovation
Renovation, Addition - 18,794 SF
Bidding
Leander, TX 78641

Emergency Operations Center and Police Department Renovation
New Construction
Bidding
$5,240,000 est. value
Deer Park, TX 77536

City of Duncanville Fire Station #1
New Construction - 15,500 SF
Sub-Bidding
Duncanville, TX 75116

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

New Fire Station 1
New Construction - 15,980 SF
Post-Bid
Groves, TX 77619

Fort Bend County Emergency Services District No. 6 Fire Station No. 1
New Construction - 7,590 SF
Results
Richmond, TX 77469

Fire Station 24 Replacement Project
New Construction, Term Contract - 16,270 SF
Results
Less than $5,900,000 est. value
San Antonio, TX 78200

Fire Station 6
Construction
League City, TX

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Fire Station #7
New Construction - 14,300 SF
Pending Verification
Pearland, TX

Police Training Center
Renovation - 1,700 SF
Pending Verification
Pearland, TX

Reported 04/06/2022 02:49 PM
Project Title

Construction Manager at Risk Services for Police Headquarters Project

Physical Address View project details and contacts
City, State (County) Kyle, TX 78640   (Hays County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced September 2021
Bids Due View project details and contacts
Estimated Value $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The station is being designed for the future and will consist of a new 64,000 square foot, two-story Police Headquarters on a newly acquired site. The station will include administration areas, patrol offices, records storage, training rooms, crime and evidence labs, an investigations suite, a special services area, dispatch, an EOC unit, a canine unit, workout space, locker rooms, and ancillary functions. Temporary space will be designated for Kyle City Hall administration use, until such future time that Police Department growth requires additional work areas. Site work will include the construction of new surface parking and other related site improvements. An emergency generator for backup power will be included on site.

Details

Fire/Police Station, 2 Stories Above Grade, 64,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents